Back to kitchen remodel contractors
Jhy Construction Inc
- Based in
- Alameda
- On San Francisco permits
- Jul 2012 to Jun 2018
- Last 24 months
- 0 permits filed
17 permits since 2000: 15 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 1 days from filing to permit and 260 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2018 | Completed final sign-off Oct 2018 | 70 Manor Dr | demo lathe & plaster at 2nd & 3rd flrs. remove load bearing wall btw dining and kitchen. reinforce roof framing @ 2nd flr living rm. remodel 1 kitchen & 3 bathrooms. reframe bedroom closets @3rd flr. relocate & expand master bath @3rd. replace/add interios doorsDetails
demo lathe & plaster at 2nd & 3rd flrs. remove load bearing wall btw dining and kitchen. reinforce roof framing @ 2nd flr living rm. remodel 1 kitchen & 3 bathrooms. reframe bedroom closets @3rd flr. relocate & expand master bath @3rd. replace/add interios doors | $50,000 |
| Apr 27, 2016 | Completed final sign-off Mar 2017 | 1336 04th Av | interior remodel at 1st floor, kitchen at 2nd floor, master bedroom at 3rd floor. all baths. horizontal subterranean expansion at 1st floor. infill pop out at 2nd floor/ repair 3rd floor rear popout in kind, add new master bath at 3rd floor/replace all rear wndws and siding.Details
interior remodel at 1st floor, kitchen at 2nd floor, master bedroom at 3rd floor. all baths. horizontal subterranean expansion at 1st floor. infill pop out at 2nd floor/ repair 3rd floor rear popout in kind, add new master bath at 3rd floor/replace all rear wndws and siding. | $125,000 |
| Aug 27, 2015 | Never finaled issued Feb 2017, no final | 274 Duncan St | vertical addition. remodel (e) 2 flr o/crawl space, add 3rd, 4th flrs, 2 new kitchens, 4 new full baths, 2 (n) 1/2 baths.Details
vertical addition. remodel (e) 2 flr o/crawl space, add 3rd, 4th flrs, 2 new kitchens, 4 new full baths, 2 (n) 1/2 baths. | $550,000 |
| Dec 24, 2013 | Completed final sign-off Sep 2014 | 1 Reposa Wy | 1st fl: add a exercise room, a bedroom, a bath, a storage and a laundry room. 2nd fl: remodel kitchen, relocate living room, replace (e) windows w/new in kind.Details
1st fl: add a exercise room, a bedroom, a bath, a storage and a laundry room. 2nd fl: remodel kitchen, relocate living room, replace (e) windows w/new in kind. | $40,000 |
| Jul 26, 2012 | Completed final sign-off Apr 2013 | 1669 07th Av | remodel ground floor to have 2 bedrooms, 1 full bathroom, storage & laundry room. install new gas furnace & water heater in garage. 2nd floor-remodel kitchen & convert 1 full bathroom into 2 full bathroomsDetails
remodel ground floor to have 2 bedrooms, 1 full bathroom, storage & laundry room. install new gas furnace & water heater in garage. 2nd floor-remodel kitchen & convert 1 full bathroom into 2 full bathrooms | $53,000 |