Jhw Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2023 to Aug 2026
- Last 24 months
- 7 permits filed
13 permits since 2000: 10 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 30 days from filing to permit and 448 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2025 | Completed final sign-off Oct 2025 | 2042 23rd Av | revision to pa#202312142553 and 202407025732. 1st floor: relocate electrical fireplace. new accordion door at rear. 2nd floor:add window at rear bedroom. reconfigure interior stair per plan, resize patio at rear yard.Details
revision to pa#202312142553 and 202407025732. 1st floor: relocate electrical fireplace. new accordion door at rear. 2nd floor:add window at rear bedroom. reconfigure interior stair per plan, resize patio at rear yard. | |
| Dec 14, 2023 | Completed final sign-off Oct 2025 | 2042 23rd Av | 1st/f: remodel kitchen, add powder rm, family, & patio at rear. 2nd/f: remodel bath, add 2 full bath. reconfifure interior stairs. add new cantilever deck at rear. infill at rearDetails
1st/f: remodel kitchen, add powder rm, family, & patio at rear. 2nd/f: remodel bath, add 2 full bath. reconfifure interior stairs. add new cantilever deck at rear. infill at rear | $320,000 |