Jeurieb Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to Oct 2024
- Last 24 months
- 1 permit filed
23 permits since 2000: 22 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 35 days from filing to permit and 254 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2023 | Completed final sign-off Jun 2023 | 1130 Filbert St | replace in-kind existing roof top deck structure, existing deck under pa# 437142 & 8902558Details
replace in-kind existing roof top deck structure, existing deck under pa# 437142 & 8902558 | $13,000 |
| Mar 31, 2023 | Completed final sign-off Aug 2026 | 2208 Mission St | unit#201: renovation of existing condo including demo of non-structural interior partitions, new interior finishes and kitchen cabinetry and new enlarged opening at existing kitchen window and new sliding door to provide access to exiting lightwell deck.Details
unit#201: renovation of existing condo including demo of non-structural interior partitions, new interior finishes and kitchen cabinetry and new enlarged opening at existing kitchen window and new sliding door to provide access to exiting lightwell deck. | $40,000 |
| Sep 16, 2022 | Completed final sign-off Jun 2023 | 1130 Filbert St | voluntary seismic stregnthening of ground floor shear walls/foundations, 2/f deck structure. work in common area & ground floor.Details
voluntary seismic stregnthening of ground floor shear walls/foundations, 2/f deck structure. work in common area & ground floor. | $80,000 |
| Aug 24, 2021 | Completed final sign-off Oct 2022 | 672 Teresita Bl | replace extg windows to sliding doors at 2nd floor. new rear deck at 7'-0" above ground.Details
replace extg windows to sliding doors at 2nd floor. new rear deck at 7'-0" above ground. | $15,000 |