Back to kitchen remodel contractors
Jericho Project
- Based in
- Brisbane
- On San Francisco permits
- Aug 2013 to Jul 2026
- Last 24 months
- 7 permits filed
26 permits since 2000: 23 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 21 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2024 | Completed final sign-off Dec 2024 | 734 17th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment. | $50,000 |
| Dec 1, 2014 | Completed final sign-off Jan 2015 | 5235 Diamond Heights Bl | #325: fill in serving window and drywall to match. serving window is existing between kitchen and dinning room, kitchen remodel and bathroom remodel also for unit.Details
#325: fill in serving window and drywall to match. serving window is existing between kitchen and dinning room, kitchen remodel and bathroom remodel also for unit. | $400 |
| Sep 5, 2013 | Completed final sign-off Sep 2013 | 5235 Diamond Heights Bl | unit #113-remove & replace kitchen sink, 1 bathroom sink. remove & replace 2 p-traps. remove & replace 14 plugs, 7 switches in kind. remove & replace 2 wall heaters & 1 bathroom fans, pull 2-20amp circuits to kitchen for microwave & counter plug. relocate 100amp panel out of closetDetails
unit #113-remove & replace kitchen sink, 1 bathroom sink. remove & replace 2 p-traps. remove & replace 14 plugs, 7 switches in kind. remove & replace 2 wall heaters & 1 bathroom fans, pull 2-20amp circuits to kitchen for microwave & counter plug. relocate 100amp panel out of closet | $15,000 |
| Aug 23, 2013 | Completed final sign-off Sep 2013 | 5285 Diamond Heights Bl | unit 318 - repair and replace one kitchen sink and one bath sink. repair & replace 14 plugs, 7 swithces like in kind. repair and replace 2 wall heaters and one bath fan. pull two 20 amp circuits to kitchen for microwave and counter plug. relocate panel out of closetDetails
unit 318 - repair and replace one kitchen sink and one bath sink. repair & replace 14 plugs, 7 swithces like in kind. repair and replace 2 wall heaters and one bath fan. pull two 20 amp circuits to kitchen for microwave and counter plug. relocate panel out of closet | $17,000 |
| Aug 15, 2013 | Completed final sign-off Aug 2013 | 5285 Diamond Heights Bl | unit #102: kitchen and bath remodel r/r kit, bath cab ,r/r elect base board heaters like in kind, r/r tamper proof receptacles and switches, relocate elect panel out of closet, r/r kit bath sinks, install high efficiency lighting in all areas. install 2 kitch circuits, microwave and counter plugDetails
unit #102: kitchen and bath remodel r/r kit, bath cab ,r/r elect base board heaters like in kind, r/r tamper proof receptacles and switches, relocate elect panel out of closet, r/r kit bath sinks, install high efficiency lighting in all areas. install 2 kitch circuits, microwave and counter plug | $17,000 |