Back to bathroom remodel contractors
James W Josephs Co
- Based in
- San Anselmo
- On San Francisco permits
- Oct 2009 to Feb 2021
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 2 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2015 | Completed final sign-off Sep 2015 | 303 Magellan Av | remodel master bathroom @ 2nd floor - demo all tile, shower, vanity top & floor. open walls & floor to faciliatate installation of new shower configuration, tub & toilet, new tile shower & floor, new 3/8 tempered glass shower enclosure minor electrical. no structural work. n/a maher ordinanceDetails
remodel master bathroom @ 2nd floor - demo all tile, shower, vanity top & floor. open walls & floor to faciliatate installation of new shower configuration, tub & toilet, new tile shower & floor, new 3/8 tempered glass shower enclosure minor electrical. no structural work. n/a maher ordinance | $40,000 |
| Nov 12, 2010 | Completed final sign-off May 2011 | 248 Missouri St | change configuration of non-bearing interior walls. add 1 bath vanity sink, light fixtures @ lower unit (2nd floor) & upper unit (3rd floor). add 25 4' low voltage, light fixtures @ lower unit & add 8 4" low voltage light fixtures @ upper unitDetails
change configuration of non-bearing interior walls. add 1 bath vanity sink, light fixtures @ lower unit (2nd floor) & upper unit (3rd floor). add 25 4' low voltage, light fixtures @ lower unit & add 8 4" low voltage light fixtures @ upper unit | $10,000 |