James W Josephs Co
- Based in
- San Anselmo
- On San Francisco permits
- Oct 2009 to Feb 2021
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 8, 2021 | Never finaled issued Jul 2021, no final | 1782 10th Av | replace existing failed concrete block landscaping retaining walls with poured in place cast concrete retaining walls. replace exisitng concrete patio slab w/ a reinforced concrete slab.Details
replace existing failed concrete block landscaping retaining walls with poured in place cast concrete retaining walls. replace exisitng concrete patio slab w/ a reinforced concrete slab. | $85,000 |
| Jun 11, 2015 | Completed final sign-off Sep 2015 | 303 Magellan Av | remodel master bathroom @ 2nd floor - demo all tile, shower, vanity top & floor. open walls & floor to faciliatate installation of new shower configuration, tub & toilet, new tile shower & floor, new 3/8 tempered glass shower enclosure minor electrical. no structural work. n/a maher ordinanceDetails
remodel master bathroom @ 2nd floor - demo all tile, shower, vanity top & floor. open walls & floor to faciliatate installation of new shower configuration, tub & toilet, new tile shower & floor, new 3/8 tempered glass shower enclosure minor electrical. no structural work. n/a maher ordinance | $40,000 |
| Apr 23, 2015 | Completed final sign-off Nov 2015 | 3121 Harrison St | new wood deck adding on (e) roof garden. new features including gas fire pit, planting bed, planter boxes, benches and stepping stonesDetails
new wood deck adding on (e) roof garden. new features including gas fire pit, planting bed, planter boxes, benches and stepping stones | $50,000 |
| Mar 14, 2012 | Completed final sign-off Aug 2012 | 2190 Broadway | install 7 new wall light fixtures. repair drywall as necessary. replace exisiting b1-fold door unit and install room divider track and paint interior. no exterior work.Details
install 7 new wall light fixtures. repair drywall as necessary. replace exisiting b1-fold door unit and install room divider track and paint interior. no exterior work. | $25,000 |
| Nov 12, 2010 | Completed final sign-off May 2011 | 248 Missouri St | change configuration of non-bearing interior walls. add 1 bath vanity sink, light fixtures @ lower unit (2nd floor) & upper unit (3rd floor). add 25 4' low voltage, light fixtures @ lower unit & add 8 4" low voltage light fixtures @ upper unitDetails
change configuration of non-bearing interior walls. add 1 bath vanity sink, light fixtures @ lower unit (2nd floor) & upper unit (3rd floor). add 25 4' low voltage, light fixtures @ lower unit & add 8 4" low voltage light fixtures @ upper unit | $10,000 |
| Jul 8, 2010 | Completed final sign-off May 2011 | 248 Missouri St | remove small portion of the existing deteriorated foundation and replace with new foundation as per engineering drawing. the portion of deteriorated existing foundation was discovered during demolitionDetails
remove small portion of the existing deteriorated foundation and replace with new foundation as per engineering drawing. the portion of deteriorated existing foundation was discovered during demolition | $5,000 |
| Oct 14, 2009 | Completed final sign-off May 2011 | 248 Missouri St | demolish (e) rear additions to original structure. remodel original structure, build new 3 story rear addition, seismic upgrade of (e) structure, new facade siding & trim. replace terrazzo & handrail at (e) front stairs, replace garage door.Details
demolish (e) rear additions to original structure. remodel original structure, build new 3 story rear addition, seismic upgrade of (e) structure, new facade siding & trim. replace terrazzo & handrail at (e) front stairs, replace garage door. | $350,000 |