James Garcia Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2009 to Jul 2023
- Last 24 months
- 0 permits filed
28 permits since 2000: 24 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 never finaled. Typically 64 days from filing to permit and 412 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2021 | Completed final sign-off Jun 2023 | 30 Chaves Av | renovation within (e) envelope. additional 2 bedrooms & 1 bath. modifications to living room, ceiling, floor, rear facade & new deck. structural upgrades & new foundation.Details
renovation within (e) envelope. additional 2 bedrooms & 1 bath. modifications to living room, ceiling, floor, rear facade & new deck. structural upgrades & new foundation. | $592,000 |
| Dec 13, 2012 | Completed final sign-off Jul 2013 | 466 Sanchez St | construction phase changes to work presently underwy per pa# 2009/01/23/0745. changes in street facade. remove 2 swinging doors at rear facade, replace with 12' wide x 8' high sliding glass door, change low roof off master bedroom at 3rd floor to deck. add door to new deck.Details
construction phase changes to work presently underwy per pa# 2009/01/23/0745. changes in street facade. remove 2 swinging doors at rear facade, replace with 12' wide x 8' high sliding glass door, change low roof off master bedroom at 3rd floor to deck. add door to new deck. | |
| Jun 1, 2009 | Never finaled issued Jun 2009, no final | 157 Villa Tr | repair deck. replace deck boards. replace railing. less thn 50%. deck approx 25' x 12' area.Details
repair deck. replace deck boards. replace railing. less thn 50%. deck approx 25' x 12' area. | $4,000 |