Back to bathroom remodel contractors
James Garcia Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2009 to Jul 2023
- Last 24 months
- 0 permits filed
28 permits since 2000: 24 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 10 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2023 | Expired or cancelled cancelled Jan 2026 | 1251 35th Av | rebuild interior stair and reconfigure ground level storage. renovate bathroomDetails
rebuild interior stair and reconfigure ground level storage. renovate bathroom | $82,700 |
| Feb 3, 2021 | Completed final sign-off Jun 2023 | 30 Chaves Av | renovation within (e) envelope. additional 2 bedrooms & 1 bath. modifications to living room, ceiling, floor, rear facade & new deck. structural upgrades & new foundation.Details
renovation within (e) envelope. additional 2 bedrooms & 1 bath. modifications to living room, ceiling, floor, rear facade & new deck. structural upgrades & new foundation. | $592,000 |
| Jun 23, 2017 | Completed final sign-off Jul 2018 | 157 Villa Tr | interior remodel of (e) occupied basement to include 2 bedroom, closets & remodeled bathroom. (n) exterior doors & double glass windows. plumbing and electrical as neededDetails
interior remodel of (e) occupied basement to include 2 bedroom, closets & remodeled bathroom. (n) exterior doors & double glass windows. plumbing and electrical as needed | $75,000 |
| Nov 21, 2014 | Never finaled issued Dec 2015, no final | 2308 21st Av | rear addition and interior remodeling, add 2nd unit at ground fl, 1 bedroom, 1 family room & 1 bathroom, kitchen & dining rm. upstair remodel & extension includes; add new bedroom and bathroom at 2nd fl.Details
rear addition and interior remodeling, add 2nd unit at ground fl, 1 bedroom, 1 family room & 1 bathroom, kitchen & dining rm. upstair remodel & extension includes; add new bedroom and bathroom at 2nd fl. | $60,000 |
| Feb 11, 2010 | Completed final sign-off Sep 2010 | 1516 35th Av | remodel kitchen & bathroom, new electrical, plumbing, tile & fixtures. lighting per cec 150 (k)Details
remodel kitchen & bathroom, new electrical, plumbing, tile & fixtures. lighting per cec 150 (k) | $30,000 |
| Jan 28, 2010 | Completed final sign-off Sep 2010 | 157 Villa Tr | bathroom remodel-new electrical, plumbing, tiles & fixtures on 2nd fl approv. 8'x7'. no adding or moving walls.Details
bathroom remodel-new electrical, plumbing, tiles & fixtures on 2nd fl approv. 8'x7'. no adding or moving walls. | $8,000 |
| Jun 30, 2009 | Completed final sign-off Sep 2009 | 664 Miramar Av | remodel bathroom, new electrical new plumbing, new tile, new fixturesDetails
remodel bathroom, new electrical new plumbing, new tile, new fixtures | $8,000 |