Permit GraphShortlistSan Francisco building permits since 2000

James E Link Landscape Design Const.

Contractor license
731605
State license record
Based in
San Francisco
On San Francisco permits
Sep 2001 to Jul 2006
Last 24 months
0 permits filed

2 permits since 2000: 1 completed, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllRoof deck 1Deck 2Stairs 1

1 stairs permit: 1 completed. Typically 123 days from filing to permit and 73 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 21, 2006Completed
final sign-off Feb 2007
542 Diamond Streplace existing deck with smaller deck in the back yard. rebuild basement staircase in kind. (not shown on drawing)
Details
Permit
200607217287
Status
complete
Filed
Jul 21, 2006
Permit issued
Nov 21, 2006
Final sign-off
Feb 2, 2007
Declared cost
$20,000
Address
542 Diamond St

replace existing deck with smaller deck in the back yard. rebuild basement staircase in kind. (not shown on drawing)

Open the permit page

$20,000