Jafco
- Based in
- El Granada
- On San Francisco permits
- Dec 2004 to Jun 2011
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 0 days from filing to permit and 28 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2007 | Completed final sign-off Jul 2007 | 447 Irving St | remove (e) overflow, replace with copper trough/scupper, bitamin seal, affix to drain (e) approx, 30 lnlft of drain/guiter replacement on (e) roof deck.Details
remove (e) overflow, replace with copper trough/scupper, bitamin seal, affix to drain (e) approx, 30 lnlft of drain/guiter replacement on (e) roof deck. | $5,000 |