Back to kitchen remodel contractors
J W Construction
- Based in
- Daly City
- On San Francisco permits
- Aug 2005 to Jul 2021
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2013 | Completed final sign-off Aug 2013 | 56 Riverton Dr | remodel kitchen & bathroom. upgrade house electrical panel, replace one interior window.Details
remodel kitchen & bathroom. upgrade house electrical panel, replace one interior window. | $21,000 |
| Aug 27, 2010 | Completed final sign-off Nov 2010 | 231 Arch St | remodel (e) kitchen on 2nd floor. rewiring and new appliance locationDetails
remodel (e) kitchen on 2nd floor. rewiring and new appliance location | $18,000 |
| May 3, 2007 | Completed final sign-off Sep 2007 | 780 Junipero Serra Bl | remodel existing kitchen with new cabinets, countertop,sink, appliances and flooring on main level. no structural work.Details
remodel existing kitchen with new cabinets, countertop,sink, appliances and flooring on main level. no structural work. | $15,000 |
| Sep 12, 2006 | Completed final sign-off Sep 2006 | 177 Warren Dr | new range hood in the (e) kitchen. replace as per listing (exhaust hood).Details
new range hood in the (e) kitchen. replace as per listing (exhaust hood). | $900 |
| May 4, 2006 | Completed final sign-off Nov 2006 | 2583 18th Av | remodel (e) kitchen, all appliances in same location. upgrade all electrical and plumbing. remodel (e0 bathroom all fixtures in same location. upgrade all electrical and plumbing. insulate ceiling and exterior walls in kitchen and bathroom. replace front window of house with wood frame. 8'x8'.Details
remodel (e) kitchen, all appliances in same location. upgrade all electrical and plumbing. remodel (e0 bathroom all fixtures in same location. upgrade all electrical and plumbing. insulate ceiling and exterior walls in kitchen and bathroom. replace front window of house with wood frame. 8'x8'. | $40,000 |