J U V Construction
- Based in
- Oakland
- On San Francisco permits
- Jan 2006 to Dec 2011
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 295 days from filing to permit and 249 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 11, 2010 | Completed final sign-off Aug 2011 | 3647 23rd St | new storefront @ ground floor commercial space facing 23rd st, replace (e)alum windows @fair oaks/23rd w/new.replace siding,modify resid facade @ fair oaks to add new windows,new entry dr,new door @ exit passage,new walkable rooftop surface 305 sf vert.addition, new access stair to roof,new curb cutDetails
new storefront @ ground floor commercial space facing 23rd st, replace (e)alum windows @fair oaks/23rd w/new.replace siding,modify resid facade @ fair oaks to add new windows,new entry dr,new door @ exit passage,new walkable rooftop surface 305 sf vert.addition, new access stair to roof,new curb cut | $80,000 |