Back to kitchen remodel contractors
J S Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2003 to May 2006
- Last 24 months
- 0 permits filed
21 permits since 2000: 13 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 3 completed, 3 never finaled. Typically 0 days from filing to permit and 123 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 8, 2005 | Completed final sign-off Aug 2005 | 106 Collins St | remodel (e) kitchen. replace 2 (e) windows. not visible from street.Details
remodel (e) kitchen. replace 2 (e) windows. not visible from street. | $35,000 |
| Feb 14, 2005 | Completed final sign-off Jun 2005 | 255 Granada Av | remodel (kitchen).convert dining room into bedroom.install new hot water heater & furnace.Details
remodel (kitchen).convert dining room into bedroom.install new hot water heater & furnace. | $38,000 |
| Sep 8, 2004 | Completed final sign-off Sep 2004 | 1540 Plymouth Av | remove lower 1/2 of stairs from kitchen down into garage. remove all rotton wood and replace with neDetails
remove lower 1/2 of stairs from kitchen down into garage. remove all rotton wood and replace with ne | $2,400 |
| Feb 18, 2004 | Never finaled issued Feb 2004, no final | 10 Athens St | remodel upstairs bathroom/remodel kitchenDetails
remodel upstairs bathroom/remodel kitchen | $10,000 |
| Nov 20, 2003 | Never finaled issued Nov 2003, no final | 10 Athens St | remodel exist kitchen 2nd floor.Details
remodel exist kitchen 2nd floor. | $17,500 |
| Oct 29, 2003 | Never finaled issued Oct 2003, no final | 728 Masonic Av | remodel kitchen&dinningroom,new electrical,move plumbing.replace 2 windows-not face street.new cabinDetails
remodel kitchen&dinningroom,new electrical,move plumbing.replace 2 windows-not face street.new cabin | $15,000 |