J Reilly Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2003 to Jan 2022
- Last 24 months
- 0 permits filed
119 permits since 2000: 102 completed, 9 never finaled, 8 expired or cancelled.
Of the 9 never-finaled permits, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
14 deck permits: 12 completed, 2 never finaled. Typically 6 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2021 | Completed final sign-off Oct 2021 | 2456 Clay St | repair dryrot at rear deck- less than 50%- in kindDetails
repair dryrot at rear deck- less than 50%- in kind | $2,500 |
| Oct 16, 2019 | Completed final sign-off Jun 2020 | 1671 Funston Av | 2nd fl - new deck at rear side of bldgDetails
2nd fl - new deck at rear side of bldg | $6,000 |
| Dec 7, 2018 | Completed final sign-off May 2019 | 1919 Greenwich St | repair existing decks and stairs in-kind, less than 50% at rear of property.Details
repair existing decks and stairs in-kind, less than 50% at rear of property. | $20,000 |
| Dec 7, 2018 | Completed final sign-off May 2019 | 1927 Greenwich St | repair existing decks and stairs in-kind, less than 50% at rear of property.Details
repair existing decks and stairs in-kind, less than 50% at rear of property. | $10,000 |
| Dec 7, 2018 | Completed final sign-off Feb 2019 | 1405 07th Av | replace existing fence; in-kind - 6' height from grade. repair existing deck @ backyard in kind, less than 50%.Details
replace existing fence; in-kind - 6' height from grade. repair existing deck @ backyard in kind, less than 50%. | $10,000 |
| Nov 18, 2016 | Completed final sign-off Aug 2018 | 91 Clarendon Av | rear horiz additions and interior alteration interior new finishes to mech(e) 1st floor: add bedroom & bath; 2nd floor: add bedroom & bath; 3rd floor: replace existing deckDetails
rear horiz additions and interior alteration interior new finishes to mech(e) 1st floor: add bedroom & bath; 2nd floor: add bedroom & bath; 3rd floor: replace existing deck | $195,000 |
| Mar 1, 2016 | Never finaled issued Mar 2016, no final | 91 Clarendon Av | remove (e) decking & replace with new. no structural work rear of house.Details
remove (e) decking & replace with new. no structural work rear of house. | $4,000 |
| Jun 19, 2014 | Completed final sign-off Mar 2015 | 734 Cayuga Av | legalize 1 bed and bath (300 sf) add hall in garage. install 3 doors at rear. add new rear deck (108sf) seismic upgrades at 1st floor only.Details
legalize 1 bed and bath (300 sf) add hall in garage. install 3 doors at rear. add new rear deck (108sf) seismic upgrades at 1st floor only. | $95,000 |
| Jan 31, 2014 | Completed final sign-off May 2017 | 135 Mendosa Av | horizontal addition to rear of building. living room, 2 guest room addition. relocate master bedroom, bath and new deck.Details
horizontal addition to rear of building. living room, 2 guest room addition. relocate master bedroom, bath and new deck. | $380,000 |
| Dec 27, 2013 | Completed final sign-off Jun 2016 | 2127 25th Av | (n) 3rd fl addition over (e) 2-story house, expansion @ rear of house. remodel all interior spaces. build (n) deck & stairs@ rear of house. upgrade foundation, mech, elec & plumbing systems.Details
(n) 3rd fl addition over (e) 2-story house, expansion @ rear of house. remodel all interior spaces. build (n) deck & stairs@ rear of house. upgrade foundation, mech, elec & plumbing systems. | $200,000 |
| Nov 19, 2013 | Completed final sign-off May 2014 | 3715 Folsom St | new door & window @ rear of building, replace garage door, new deck.Details
new door & window @ rear of building, replace garage door, new deck. | $5,000 |
| Jun 21, 2012 | Completed final sign-off Jun 2012 | 44 15th Av | remove tile on existing deck, replace with trex, no framing, no structural, not visable from street.Details
remove tile on existing deck, replace with trex, no framing, no structural, not visable from street. | $1,700 |
| Oct 20, 2009 | Never finaled issued Aug 2010, no final | 3539 Santiago St | 2 story horizontal addition to rear of existing 2 story building. new deck & bathroom on upper level & new bathroom on lower level.Details
2 story horizontal addition to rear of existing 2 story building. new deck & bathroom on upper level & new bathroom on lower level. | $100,000 |
| Apr 11, 2008 | Completed final sign-off Jul 2009 | 275 Urbano Dr | horizontal extension. remodel (e) 1st floor (kitchen & bathroom) and add new master bedroom, bath and new deck. add new bedrooms, bath, laundry and family room at ground floor.Details
horizontal extension. remodel (e) 1st floor (kitchen & bathroom) and add new master bedroom, bath and new deck. add new bedrooms, bath, laundry and family room at ground floor. | $250,000 |