Back to bathroom remodel contractors
J Reilly Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2003 to Jan 2022
- Last 24 months
- 0 permits filed
119 permits since 2000: 102 completed, 9 never finaled, 8 expired or cancelled.
Of the 9 never-finaled permits, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
34 bathroom remodel permits: 30 completed, 2 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 6, 2019 | Expired or cancelled expired Nov 2024 | 4112 21st St | alter site: admin permit to pa#201705096079, correct permit form slope of work: "remodel and addition to an existing single family residence from 1009 sq ft to 3475 sq ft" work includes new basement, new 3rd floor addition, remodel of all existing bath, bedroom and kitchen. basement height 27'-7".Details
alter site: admin permit to pa#201705096079, correct permit form slope of work: "remodel and addition to an existing single family residence from 1009 sq ft to 3475 sq ft" work includes new basement, new 3rd floor addition, remodel of all existing bath, bedroom and kitchen. basement height 27'-7". | |
| Sep 6, 2019 | Completed final sign-off Jun 2020 | 1671 Funston Av | 1st fl - new bedroom; bathroom, laundry area & media room. approx 700 sf; 2nd fl - relocate & remodel (e) kitchen & remodel bathroom; relocate bedroom on 2nd fl; new skylightDetails
1st fl - new bedroom; bathroom, laundry area & media room. approx 700 sf; 2nd fl - relocate & remodel (e) kitchen & remodel bathroom; relocate bedroom on 2nd fl; new skylight | $30,000 |
| Apr 17, 2019 | Completed final sign-off Nov 2019 | 2019 42nd Av | remodel lower level of house to add bathroomDetails
remodel lower level of house to add bathroom | $25,000 |
| Aug 1, 2018 | Completed final sign-off Dec 2018 | 385 Cumberland St | remodel 2 existing bathroom, no change in wall and opening layout.Details
remodel 2 existing bathroom, no change in wall and opening layout. | $40,000 |
| Jul 27, 2018 | Completed final sign-off Feb 2019 | 91 Bronte St | revisions to pa # 201804176579. 1st floor, add new family room and full bath.Details
revisions to pa # 201804176579. 1st floor, add new family room and full bath. | $41,500 |
| May 22, 2018 | Completed final sign-off Aug 2018 | 532 Clayton St | remodel bathroom in-kind; change out / upgrade tim in interior entry stairway.Details
remodel bathroom in-kind; change out / upgrade tim in interior entry stairway. | $20,000 |
| Mar 21, 2018 | Completed final sign-off Dec 2018 | 1307 Montgomery St | remodel kitchen &bathroom in kind, upgrade cabinets, counters, backspash, plumbing fixtures etc, no structural work lighting chages will comply with cec150kDetails
remodel kitchen &bathroom in kind, upgrade cabinets, counters, backspash, plumbing fixtures etc, no structural work lighting chages will comply with cec150k | $28,000 |
| Jan 29, 2018 | Completed final sign-off Aug 2020 | 207 Claremont Bl | remodel existing 1st floor area behind existing garage. excavate down, remove existing footing and build new bathroom, bedroom, laundry and family room. upgrade existing electrical, plumbing and mechanical systemDetails
remodel existing 1st floor area behind existing garage. excavate down, remove existing footing and build new bathroom, bedroom, laundry and family room. upgrade existing electrical, plumbing and mechanical system | $125,000 |
| Jan 5, 2018 | Completed final sign-off Feb 2022 | 4 Aquavista Wy | horizontal and vertical addition. no excavation or foundation added. add (n) garage @ 1st flr. total 2.5 baths & 2 beds will be added. add wood roof deck. ref pa# 201704123783Details
horizontal and vertical addition. no excavation or foundation added. add (n) garage @ 1st flr. total 2.5 baths & 2 beds will be added. add wood roof deck. ref pa# 201704123783 | $475,000 |
| Dec 26, 2017 | Never finaled issued Jan 2018, no final | 2952 Franklin St | interior remodel of extg ground floor, new interior stair at ground and 2nd floor. new bathroom and laundry at ground floor.Details
interior remodel of extg ground floor, new interior stair at ground and 2nd floor. new bathroom and laundry at ground floor. | $80,000 |
| Aug 29, 2017 | Completed final sign-off Dec 2017 | 6 Berkeley Wy | remodel (2) full bathrooms & (1-1/2) bathroom in-kind, no structural workDetails
remodel (2) full bathrooms & (1-1/2) bathroom in-kind, no structural work | $20,000 |
| May 9, 2017 | Expired or cancelled expired Nov 2024 | 4112 21st St | remodel & addition to (e) 1006 sf residence to 3443 sf. all bedrooms, bathrooms & kitchens are to be remodeled. bath increase 1 to 2.5 & bedroom increase from 2 to 5.Details
remodel & addition to (e) 1006 sf residence to 3443 sf. all bedrooms, bathrooms & kitchens are to be remodeled. bath increase 1 to 2.5 & bedroom increase from 2 to 5. | $550,000 |
| Nov 18, 2016 | Completed final sign-off Aug 2018 | 91 Clarendon Av | rear horiz additions and interior alteration interior new finishes to mech(e) 1st floor: add bedroom & bath; 2nd floor: add bedroom & bath; 3rd floor: replace existing deckDetails
rear horiz additions and interior alteration interior new finishes to mech(e) 1st floor: add bedroom & bath; 2nd floor: add bedroom & bath; 3rd floor: replace existing deck | $195,000 |
| Oct 11, 2016 | Completed final sign-off Jan 2018 | 2424 14th Av | remodel and addition w/in bld footprint. add 1 bath and family room, remodel laundry and 2 baths and add new staircase.Details
remodel and addition w/in bld footprint. add 1 bath and family room, remodel laundry and 2 baths and add new staircase. | $175,000 |
| Sep 22, 2016 | Completed final sign-off Dec 2016 | 105 Palm Av | remove closet wall, create new master bedroom with 2nd bathroom, add closet to bedroom in new location. add, remove, change doors to suit proposed plan.Details
remove closet wall, create new master bedroom with 2nd bathroom, add closet to bedroom in new location. add, remove, change doors to suit proposed plan. | $21,000 |
| Aug 22, 2016 | Completed final sign-off Jan 2017 | 4184 20th St | expand master bath into e master closet by removing wall, add wall in adjoining bedroom to create new master closet and new second bedroom closet, adjust door placement and type to suit proposed planDetails
expand master bath into e master closet by removing wall, add wall in adjoining bedroom to create new master closet and new second bedroom closet, adjust door placement and type to suit proposed plan | $30,000 |
| Oct 16, 2015 | Completed final sign-off Aug 2016 | 19 Balceta Av | create habitable space at (e) 1st floor garage level. habitable space includes a bedroom suite, lower level bathroom, family room & laundry storage area.Details
create habitable space at (e) 1st floor garage level. habitable space includes a bedroom suite, lower level bathroom, family room & laundry storage area. | $93,000 |
| Jan 13, 2015 | Completed final sign-off May 2015 | 584 Hill St | remodel existing bathroom at 1st floor: install new toilet, vanity, and add shower and enclosure, remove bathtub; replace one existing window in bathroom, and open new window at vanity, new lighting.Details
remodel existing bathroom at 1st floor: install new toilet, vanity, and add shower and enclosure, remove bathtub; replace one existing window in bathroom, and open new window at vanity, new lighting. | $15,000 |
| Jun 19, 2014 | Completed final sign-off Mar 2015 | 734 Cayuga Av | legalize 1 bed and bath (300 sf) add hall in garage. install 3 doors at rear. add new rear deck (108sf) seismic upgrades at 1st floor only.Details
legalize 1 bed and bath (300 sf) add hall in garage. install 3 doors at rear. add new rear deck (108sf) seismic upgrades at 1st floor only. | $95,000 |
| Jan 31, 2014 | Completed final sign-off May 2017 | 135 Mendosa Av | horizontal addition to rear of building. living room, 2 guest room addition. relocate master bedroom, bath and new deck.Details
horizontal addition to rear of building. living room, 2 guest room addition. relocate master bedroom, bath and new deck. | $380,000 |
| Jan 9, 2014 | Completed final sign-off Mar 2014 | 221 Central Av | remodel of (e) third floor to add one new master bathroom & adjustment to adjacent (e) guest room & install new skylight.Details
remodel of (e) third floor to add one new master bathroom & adjustment to adjacent (e) guest room & install new skylight. | $22,000 |
| May 10, 2013 | Completed final sign-off Oct 2013 | 49 Caselli Av | revision to app#201304235192. create new habitable space at 1st floor(new bedroom, bath, & family(media room). create new stairs connecting all 3 floor, new front entry door, add new master bath at 3rd floor. replace all windows. upgrade electrical, plmg and mech system.Details
revision to app#201304235192. create new habitable space at 1st floor(new bedroom, bath, & family(media room). create new stairs connecting all 3 floor, new front entry door, add new master bath at 3rd floor. replace all windows. upgrade electrical, plmg and mech system. | $200,000 |
| Mar 26, 2013 | Completed final sign-off Oct 2013 | 49 Caselli Av | remodel and relocate kitchen at 1st floor. remove extg 1st floor bath and build new half bath. remodel extg bath at 2nd floor. remove kitchen at 2nd floor.Details
remodel and relocate kitchen at 1st floor. remove extg 1st floor bath and build new half bath. remodel extg bath at 2nd floor. remove kitchen at 2nd floor. | $30,000 |
| Oct 30, 2012 | Completed final sign-off Jan 2013 | 4470 17th St | change vanity and toilet in bathroom #1. change vanity, toilet, tub and re-tile bathroom # 2Details
change vanity and toilet in bathroom #1. change vanity, toilet, tub and re-tile bathroom # 2 | $8,000 |
| Feb 23, 2012 | Completed final sign-off May 2014 | 3715 Folsom St | new bathroom & legalize (e)study at gr fl, new vestibule, new closet, remove portion of wall @ (garage) 1st floor. new guardrail for interior stairs.Details
new bathroom & legalize (e)study at gr fl, new vestibule, new closet, remove portion of wall @ (garage) 1st floor. new guardrail for interior stairs. | $11,329 |
| Dec 29, 2011 | Completed final sign-off Jun 2012 | 552 Melrose Av | remodel ktichen and bath in current location. replace front windows. build new retaining wall at rear yard.Details
remodel ktichen and bath in current location. replace front windows. build new retaining wall at rear yard. | $65,000 |
| Oct 4, 2010 | Completed final sign-off Jan 2011 | 2246 17th Av | remodel bathroom, replace galvanized plumbing with copper.Details
remodel bathroom, replace galvanized plumbing with copper. | $15,000 |
| Oct 20, 2009 | Never finaled issued Aug 2010, no final | 3539 Santiago St | 2 story horizontal addition to rear of existing 2 story building. new deck & bathroom on upper level & new bathroom on lower level.Details
2 story horizontal addition to rear of existing 2 story building. new deck & bathroom on upper level & new bathroom on lower level. | $100,000 |
| Feb 3, 2009 | Completed final sign-off Apr 2009 | 2456 Clay St | remodel bathroom. relocate shower & toilet. upgrade plumbing & electric. replace vanity & countertop. one bathroom only. provide fluorecent light or "manual on" occupancy sensors in the bathroom.Details
remodel bathroom. relocate shower & toilet. upgrade plumbing & electric. replace vanity & countertop. one bathroom only. provide fluorecent light or "manual on" occupancy sensors in the bathroom. | $17,000 |
| Apr 11, 2008 | Completed final sign-off Jul 2009 | 275 Urbano Dr | horizontal extension. remodel (e) 1st floor (kitchen & bathroom) and add new master bedroom, bath and new deck. add new bedrooms, bath, laundry and family room at ground floor.Details
horizontal extension. remodel (e) 1st floor (kitchen & bathroom) and add new master bedroom, bath and new deck. add new bedrooms, bath, laundry and family room at ground floor. | $250,000 |
| Jun 20, 2007 | Completed final sign-off Nov 2007 | 2470 46th Av | remodel kitchen adn two bathroom 2nd floor. new appliances and cabinet upgrade only. no removal of wall.replace current fixture with fluorescent fixture.Details
remodel kitchen adn two bathroom 2nd floor. new appliances and cabinet upgrade only. no removal of wall.replace current fixture with fluorescent fixture. | $35,000 |
| Mar 23, 2007 | Completed final sign-off Jun 2007 | 3922 21st St | bathroom upgrade / remodel. change out vanity, patch up sheetrock, tile, paint. no electrical work.Details
bathroom upgrade / remodel. change out vanity, patch up sheetrock, tile, paint. no electrical work. | $5,000 |
| Mar 6, 2006 | Completed final sign-off May 2006 | 532 Clayton St | remodel of (e) bathroom (no structural changes) shower, toilete, plumbing, electrical, provide flourescent lights, any non flourescent lights, must be controled by manual on occupancy sensors.Details
remodel of (e) bathroom (no structural changes) shower, toilete, plumbing, electrical, provide flourescent lights, any non flourescent lights, must be controled by manual on occupancy sensors. | $10,000 |
| Oct 17, 2003 | Completed final sign-off Dec 2003 | 2200 Mariposa St | remodel (e)bathroom on 2/fDetails
remodel (e)bathroom on 2/f | $6,500 |