Back to kitchen remodel contractors
J R S Refrigeration & Construction Svc
- Based in
- Madera
- On San Francisco permits
- May 2016 to May 2016
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 101 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 24, 2016 | Completed final sign-off Sep 2016 | 1483 Sutter St | water damage in kitchen & adjacent living room wall; replace kitch cabinets & counters-same locations-install 15"-18" of gypsum board to lower wall in living room +/- 10'; install new floor, baseboard & paint, no alterations to electrical, wall, window or door.Details
water damage in kitchen & adjacent living room wall; replace kitch cabinets & counters-same locations-install 15"-18" of gypsum board to lower wall in living room +/- 10'; install new floor, baseboard & paint, no alterations to electrical, wall, window or door. | $11,000 |