Back to kitchen remodel contractors
J R Home Remodeling Inc
- Based in
- Daly City
- On San Francisco permits
- Feb 2023 to Oct 2026
- Last 24 months
- 10 permits filed
21 permits since 2000: 11 completed, 8 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 5 completed, 2 in progress, 1 never finaled. Typically 2 days from filing to permit and 287 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2026 | In progress issued Mar 2026 | 790 07th Av | unit 404: master bath remodel, converting tub to walk-in shower. bath remodel. subpanel location change. remodel (e) kitchen. add laundry facilities and add 25 recessed lights.Details
unit 404: master bath remodel, converting tub to walk-in shower. bath remodel. subpanel location change. remodel (e) kitchen. add laundry facilities and add 25 recessed lights. | $65,000 |
| Feb 18, 2025 | In progress issued Jul 2025 | 76 Cortland Av | n)st lvl foyer and internal stairs to main level, new facade finishes, including n) exteror claddding, doors and windows, n) rear facade window. main lvl move kitchen from rear to front of bldg. electrical upgrade to 200 amp, relocate gas meter ++++++++ ++++++++++++++++++++ -Details
n)st lvl foyer and internal stairs to main level, new facade finishes, including n) exteror claddding, doors and windows, n) rear facade window. main lvl move kitchen from rear to front of bldg. electrical upgrade to 200 amp, relocate gas meter ++++++++ ++++++++++++++++++++ - | $90,000 |
| Aug 28, 2024 | Completed final sign-off Sep 2025 | 422 Corbett Av | remodel kitchen and bathrooms; remove load bearing wall; install (n) sliding door; convert 2nd bedroom to dining roomDetails
remodel kitchen and bathrooms; remove load bearing wall; install (n) sliding door; convert 2nd bedroom to dining room | $45,000 |
| Jun 13, 2024 | Completed final sign-off Apr 2025 | 205 Elsie St | interior remodel: remodel kitchen and two bathrooms, add one bathroom upstiars. add closets in upstairs bedrooms. replace two non street facing windows and infill one non-street facing window.Details
interior remodel: remodel kitchen and two bathrooms, add one bathroom upstiars. add closets in upstairs bedrooms. replace two non street facing windows and infill one non-street facing window. | $130,000 |
| May 16, 2024 | Completed final sign-off Dec 2024 | 2205 Sacramento St | unit 104, kitchen and bath remodel. adding shower stall for primary bathroom. adding lighting to hallway, living, and dining room.Details
unit 104, kitchen and bath remodel. adding shower stall for primary bathroom. adding lighting to hallway, living, and dining room. | $70,000 |
| Apr 10, 2024 | Completed final sign-off Aug 2024 | 135 Garcia Av | remodel kitchen and 3 bathrooms; removing load bearing wall and installing new sliding doorDetails
remodel kitchen and 3 bathrooms; removing load bearing wall and installing new sliding door | $120,000 |
| May 24, 2023 | Never finaled issued Jul 2023, no final | 50 Inca Ln | unit 5: remodel (1) bathrooms & (1) kitchen add electrical subpanel. convert closet to laundry rm. no exterior work.Details
unit 5: remodel (1) bathrooms & (1) kitchen add electrical subpanel. convert closet to laundry rm. no exterior work. | $78,400 |
| Feb 14, 2023 | Completed final sign-off Jun 2024 | 436 36th Av | kitchen & bathroom remodel: replace living rm window and dinning sliding doors (no structural) (not facing street). replace (e) electrical main panel @ garage with 200 amp.Details
kitchen & bathroom remodel: replace living rm window and dinning sliding doors (no structural) (not facing street). replace (e) electrical main panel @ garage with 200 amp. | $120,000 |