Back to kitchen remodel contractors
J P E Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Sep 2026
- Last 24 months
- 19 permits filed
65 permits since 2000: 34 completed, 15 in progress, 7 never finaled, 9 expired or cancelled.
Of the 7 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 6 completed, 2 in progress, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2026 | In progress issued Aug 2026 | 157 12th Av | kitchen remodel, repair drywall in living room, wall and ceiling, repair drywall in downstairs bedroom walls and ceiling. paint kitchen, walls, and bedroom. all work is interior.Details
kitchen remodel, repair drywall in living room, wall and ceiling, repair drywall in downstairs bedroom walls and ceiling. paint kitchen, walls, and bedroom. all work is interior. | $8,000 |
| Jul 25, 2024 | Completed final sign-off Aug 2024 | 31 Lydia Av | one kitchen remodel: change all cabinets, countertops, change all appliances, and change all floor tilesDetails
one kitchen remodel: change all cabinets, countertops, change all appliances, and change all floor tiles | $15,000 |
| Jun 7, 2024 | In progress issued Jun 2024 | 1622 19th Av | at 2/f. remodel (e) kitchen, bath, (n) master bath, and (n) exterior stairs to rear yard. to comply with nov# 202420943.Details
at 2/f. remodel (e) kitchen, bath, (n) master bath, and (n) exterior stairs to rear yard. to comply with nov# 202420943. | $189,000 |
| Jun 30, 2023 | Completed final sign-off May 2024 | 1582 21st Av | one kitchen and one bathroom remodel.Details
one kitchen and one bathroom remodel. | $35,000 |
| Feb 7, 2023 | Never finaled issued Feb 2023, no final | 139 Blake St | to comply with complaint #201040564, 201642851: gas direct vent, lead paint encapsulation, misc bathroom and kitchen repairs (mold removal and painting), install tankless water heater, remove combustible storage, eliminate mold, repair walls, use water based paint. kitchen: 50 sf. bathroom: 40 sf.Details
to comply with complaint #201040564, 201642851: gas direct vent, lead paint encapsulation, misc bathroom and kitchen repairs (mold removal and painting), install tankless water heater, remove combustible storage, eliminate mold, repair walls, use water based paint. kitchen: 50 sf. bathroom: 40 sf. | $3,000 |
| Feb 7, 2023 | Never finaled issued Feb 2023, no final | 139 Blake St | #143. kitchen remodel exchange cabinet, sink and faucet. stove and hood (min 100 cfm). bathroom remodel, exchange bath tup toilet, sink and fauct, wall tiles and floor tiles. repair the roof with shingle. remodel in kind. items min 100 cfm.Details
#143. kitchen remodel exchange cabinet, sink and faucet. stove and hood (min 100 cfm). bathroom remodel, exchange bath tup toilet, sink and fauct, wall tiles and floor tiles. repair the roof with shingle. remodel in kind. items min 100 cfm. | $18,000 |
| Apr 6, 2022 | Completed final sign-off May 2022 | 1654 42nd Av | comply w/ complaint 202288924 add two bedroom, one full bath, one media room and 2nd kitchen @ ground floor.Details
comply w/ complaint 202288924 add two bedroom, one full bath, one media room and 2nd kitchen @ ground floor. | $60,000 |
| Dec 18, 2019 | Never finaled issued Dec 2019, no final | 246 Delano Av | remodel kitchen 12'x16' and one bedroom 5'x8' on 2nd floor. remodel one bathroom 5'x8' on 3rd floorDetails
remodel kitchen 12'x16' and one bedroom 5'x8' on 2nd floor. remodel one bathroom 5'x8' on 3rd floor | $35,000 |
| Jun 12, 2019 | Completed final sign-off Jan 2020 | 209 Chattanooga St | remodel kitchen & bathroom. new sheetrock in entire house.Details
remodel kitchen & bathroom. new sheetrock in entire house. | $2,500 |
| May 21, 2019 | Completed final sign-off Apr 2022 | 2166 19th Av | install 2 bedroom, 1 storage room and 2 bathroom in the garage, install 1 new bathroom and remoel 1 (e) bathroom on the 2nd fl., 3rd fl convert the (e) washing room to the toilet room, replace some (e) windows per plans, repair roof and front stucco. remodel kitchen.Details
install 2 bedroom, 1 storage room and 2 bathroom in the garage, install 1 new bathroom and remoel 1 (e) bathroom on the 2nd fl., 3rd fl convert the (e) washing room to the toilet room, replace some (e) windows per plans, repair roof and front stucco. remodel kitchen. | $12,000 |
| May 17, 2019 | Completed final sign-off Sep 2019 | 227 Clinton Pk | apartment 2: kitchen and bathroom remodel.Details
apartment 2: kitchen and bathroom remodel. | $5,000 |
| Sep 27, 2016 | Expired or cancelled expired Jan 2026 | 2458 30th Av | garage floor - install (1) storage room, 2 bedrms, bathrm; 2nd floor - remove to rebuild partial wall for bathrm, kitchen & dining rm, remove 1 (e) bathrm, install 2 (n) bathrms, remodel (e) kitchen & rebuild (n) kitchen. remove (3) patio & close up partial roof at patio area. install (5) skylights,Details
garage floor - install (1) storage room, 2 bedrms, bathrm; 2nd floor - remove to rebuild partial wall for bathrm, kitchen & dining rm, remove 1 (e) bathrm, install 2 (n) bathrms, remodel (e) kitchen & rebuild (n) kitchen. remove (3) patio & close up partial roof at patio area. install (5) skylights, | $135,000 |