J L General Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Nov 2025
- Last 24 months
- 1 permit filed
47 permits since 2000: 32 completed, 4 never finaled, 11 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
21 kitchen remodel permits: 19 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 279 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2023 | Completed final sign-off Jan 2025 | 1711 Eucalyptus Dr | interior remodel of existing 2 bathrooms and kitchen at 2nd flr as per plan.Details
interior remodel of existing 2 bathrooms and kitchen at 2nd flr as per plan. | $50,000 |
| May 19, 2022 | Completed final sign-off Jan 2025 | 228 Tingley St | interior remodel. add 1 new bathroom. remodel (e) bath, (e) kitchen at 2nd fl per plan.Details
interior remodel. add 1 new bathroom. remodel (e) bath, (e) kitchen at 2nd fl per plan. | $40,000 |
| Mar 16, 2022 | Completed final sign-off Jan 2025 | 184 Jordan Av | rev 202007089808: replace (e) garage door at 1/f, patio doors @ 1/f & 2/f and windows on 2/f & 3/f. add (n) partition wall at 2/f kitchen. add 1 (n) window at 1/f along gridline 5, add 1 (n) window at 2/f lightwell,relocate ktichen and add (n) skylight at 3/f.Details
rev 202007089808: replace (e) garage door at 1/f, patio doors @ 1/f & 2/f and windows on 2/f & 3/f. add (n) partition wall at 2/f kitchen. add 1 (n) window at 1/f along gridline 5, add 1 (n) window at 2/f lightwell,relocate ktichen and add (n) skylight at 3/f. | $50,000 |
| Jul 8, 2020 | Completed final sign-off Jul 2024 | 184 Jordan Av | rev to pa# 201911197651. designate 186 jordon, non-conform unit. remove stair at center of bldg. n deck @2/f. add n stair btw 1 & 2/f. add 1 bath, 1 bedrm, 1 entertainment rm, 1 m.bedrm w/bath on 1/f. kitchen remodel w/open design, add 1 powder rm on 2/f. 3/f add 1 bath, 1 laundry, n stairs toDetails
rev to pa# 201911197651. designate 186 jordon, non-conform unit. remove stair at center of bldg. n deck @2/f. add n stair btw 1 & 2/f. add 1 bath, 1 bedrm, 1 entertainment rm, 1 m.bedrm w/bath on 1/f. kitchen remodel w/open design, add 1 powder rm on 2/f. 3/f add 1 bath, 1 laundry, n stairs to | $200,000 |
| Nov 19, 2019 | Completed final sign-off Jul 2024 | 184 Jordan Av | convert(e)sunroom into office, relocate(e)living room 3rd fl. add 1 master rm w/ walk in close, remodel e kitchen 3rd fl. 2nd fl: relocate e dining rm to combine with sunroom. all work on 2nd and 3rd flDetails
convert(e)sunroom into office, relocate(e)living room 3rd fl. add 1 master rm w/ walk in close, remodel e kitchen 3rd fl. 2nd fl: relocate e dining rm to combine with sunroom. all work on 2nd and 3rd fl | $80,000 |
| Feb 27, 2018 | Completed final sign-off Jan 2019 | 1548 Powell St | remodel kitchen bathroom, living room and 3 bedrooms. new sheetrockDetails
remodel kitchen bathroom, living room and 3 bedrooms. new sheetrock | $45,000 |
| Nov 8, 2017 | Completed final sign-off May 2018 | 935 Burnett Av | unit 6: remodel kitchen and bathDetails
unit 6: remodel kitchen and bath | $35,000 |
| Sep 8, 2017 | Completed final sign-off Jan 2018 | 2665 El Camino Del Mar | unit 2: kitchen and bathroom remodel. no structural changes. on second floor.Details
unit 2: kitchen and bathroom remodel. no structural changes. on second floor. | $32,800 |
| Feb 13, 2017 | Completed final sign-off Sep 2017 | 2419 34th Av | remodel (e) 2nd floor - 2 new bathrooms, relocate kitchen to (e) dining room area, new home office at (e) kitchen area. convert (e) toilet room to laundry room. remove bearing wall in (e) dining room and living roomDetails
remodel (e) 2nd floor - 2 new bathrooms, relocate kitchen to (e) dining room area, new home office at (e) kitchen area. convert (e) toilet room to laundry room. remove bearing wall in (e) dining room and living room | $50,000 |
| Mar 25, 2016 | Expired or cancelled cancelled Oct 2016 | 267 18th Av | add new entertainment room, family room, relocate 2 bathrooms at ground floor. remodel (e) kitchen, bath, relocate interior stairway fill in (e) lightwell @ 2nd floor. no exterior work and no change in units.Details
add new entertainment room, family room, relocate 2 bathrooms at ground floor. remodel (e) kitchen, bath, relocate interior stairway fill in (e) lightwell @ 2nd floor. no exterior work and no change in units. | $98,000 |
| Sep 8, 2015 | Completed final sign-off Oct 2016 | 1986 18th Av | to comply with: nov 201327701; rewire elect thru-out bld & install (n) lighting. demo all gyp board @ (e) bld. remodel & reedesign all bathrooms & kitchen. redesign partial stairs going to garage to comply with code. replace (e) furnace & w/h & all ducts. replace all windows @ rear of bld.Details
to comply with: nov 201327701; rewire elect thru-out bld & install (n) lighting. demo all gyp board @ (e) bld. remodel & reedesign all bathrooms & kitchen. redesign partial stairs going to garage to comply with code. replace (e) furnace & w/h & all ducts. replace all windows @ rear of bld. | $86,600 |
| Jan 7, 2015 | Completed final sign-off Feb 2016 | 1223 34th Av | interior remodel: add a (n) bedroom, entertainment & full bathroom at ground floor; remodel (e) kitchen, relocate (e) bath,add (n)bathrm & create interior stair at 2nd flr.Details
interior remodel: add a (n) bedroom, entertainment & full bathroom at ground floor; remodel (e) kitchen, relocate (e) bath,add (n)bathrm & create interior stair at 2nd flr. | $60,000 |
| Nov 10, 2014 | Completed final sign-off Jun 2015 | 1546 Powell St | kitchen and bathroom remodel. (no walls moved, removed or added). same location, no structural work.Details
kitchen and bathroom remodel. (no walls moved, removed or added). same location, no structural work. | $32,800 |
| Sep 5, 2014 | Never finaled issued Sep 2014, no final | 1890 35th Av | add 2 new skylights, remodel (e) bath, add 2nd bath, replace bearing wall with beam above, kitchen/dining, new lighting. all work on 2nd flr only as shown on plans.Details
add 2 new skylights, remodel (e) bath, add 2nd bath, replace bearing wall with beam above, kitchen/dining, new lighting. all work on 2nd flr only as shown on plans. | $40,000 |
| Jun 20, 2014 | Completed final sign-off Mar 2015 | 1890 35th Av | kitchen and bathroom remodel, no wall moved, remove or add. all fixture locations and layouts to remain unchanged. comply with complaint #201480511Details
kitchen and bathroom remodel, no wall moved, remove or add. all fixture locations and layouts to remain unchanged. comply with complaint #201480511 | $15,000 |
| Jan 22, 2014 | Completed final sign-off Feb 2015 | 2706 24th St | change of use b to a. ground floor - new restaurant, minor non-structural demolitoin, new kitchen, dish washing station, walk-in cooler, office, bar, lighting, hvac, structural framing. life safety under separate permits. ** maher: compliance with ordinance no# 155-13 not required **Details
change of use b to a. ground floor - new restaurant, minor non-structural demolitoin, new kitchen, dish washing station, walk-in cooler, office, bar, lighting, hvac, structural framing. life safety under separate permits. ** maher: compliance with ordinance no# 155-13 not required ** | $65,000 |
| Aug 3, 2012 | Completed final sign-off Oct 2012 | 1355 Scott St | interior remodeling: remodel (e) kitchen @ ground floor. remodel bathroom @ 2nd. floor as per plan.Details
interior remodeling: remodel (e) kitchen @ ground floor. remodel bathroom @ 2nd. floor as per plan. | $20,000 |
| Jun 27, 2012 | Completed final sign-off Sep 2012 | 935 Burnett Av | #3- 1 kitchen remodel: replace cabinets, countertops,floor tiles,sink,faucet,dishwasher, range hood and stove. electrical outlet (gfi). bathroom remodel: remodel floor, wall tiles, toilet, bathtub, faucets, vanity, vanity top, exhaust fan and gfi outlet. relocate extg electrical panel.Details
#3- 1 kitchen remodel: replace cabinets, countertops,floor tiles,sink,faucet,dishwasher, range hood and stove. electrical outlet (gfi). bathroom remodel: remodel floor, wall tiles, toilet, bathtub, faucets, vanity, vanity top, exhaust fan and gfi outlet. relocate extg electrical panel. | $10,000 |
| Nov 1, 2011 | Completed final sign-off Oct 2014 | 339 Kirkham St | remodel rear of house: remove 2bedrm, add (n) dining, kitchen & living rm & rear yard deck. relocate (e) bath & storage on level 2. remodel level 1 (garage), raise garage ceiling 2ft. add (n) family rm, bedrm & bath. add (n) level 3 in attic space in front, new fl in back w/ 3bedrm, 2bathrm. upgradeDetails
remodel rear of house: remove 2bedrm, add (n) dining, kitchen & living rm & rear yard deck. relocate (e) bath & storage on level 2. remodel level 1 (garage), raise garage ceiling 2ft. add (n) family rm, bedrm & bath. add (n) level 3 in attic space in front, new fl in back w/ 3bedrm, 2bathrm. upgrade | $150,000 |
| Jan 7, 2011 | Completed final sign-off Feb 2011 | 2242 43rd Av | replace kitchen cabinets and countertopDetails
replace kitchen cabinets and countertop | $7,000 |
| Apr 26, 2006 | Completed final sign-off Aug 2006 | 1566 20th Av | remodeling kitchen-replace cabinet, counter top, floor tile, sink. non structural.Details
remodeling kitchen-replace cabinet, counter top, floor tile, sink. non structural. | $15,000 |