Back to bathroom remodel contractors
J L Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Mar 2001 to Sep 2017
- Last 24 months
- 0 permits filed
24 permits since 2000: 22 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 never finaled. Typically 0 days from filing to permit and 50 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2016 | Completed final sign-off Dec 2016 | 4133 18th St | remodel kitchen & bathroom, add half bath & convert front living room into bedroom. no work visible from street.(e) kitchen space to become new dr.Details
remodel kitchen & bathroom, add half bath & convert front living room into bedroom. no work visible from street.(e) kitchen space to become new dr. | $30,000 |
| Mar 2, 2015 | Never finaled issued Mar 2015, no final | 285 Topaz Wy | elevator installation. master bath remodel, 2 new window openingsDetails
elevator installation. master bath remodel, 2 new window openings | $65,000 |
| Apr 10, 2014 | Completed final sign-off May 2014 | 3395 Balboa St | apt #1. remodel kitchen and 2 bathrooms. no new windows or doors.Details
apt #1. remodel kitchen and 2 bathrooms. no new windows or doors. | $18,000 |
| Mar 3, 2014 | Completed final sign-off Apr 2014 | 3395 Balboa St | work in unit #7: remodel kitchen and bathroom - no new windows and doors.Details
work in unit #7: remodel kitchen and bathroom - no new windows and doors. | $10,000 |
| Oct 2, 2013 | Completed final sign-off Aug 2015 | 116 Wawona St | develop 3rd floor attic storage area by adding dormers to provide 2 new bedrooms, bathroom & office. ground floor (e) family room, bathroom & laundry to be remodeled & guest room added. work at main floor includes new stair to attic.Details
develop 3rd floor attic storage area by adding dormers to provide 2 new bedrooms, bathroom & office. ground floor (e) family room, bathroom & laundry to be remodeled & guest room added. work at main floor includes new stair to attic. | $175,000 |
| Jul 10, 2013 | Completed final sign-off Aug 2013 | 624 16th Av | bathroom remodeling replace bath tub , sink & fixturesDetails
bathroom remodeling replace bath tub , sink & fixtures | $6,000 |
| Dec 11, 2007 | Completed final sign-off Feb 2008 | 3618 22nd St | work on #2. remodel bathroom.replace bath-tub, sink, toilet, floor & wall tile. (e) light fixtures to remain. no structural.Details
work on #2. remodel bathroom.replace bath-tub, sink, toilet, floor & wall tile. (e) light fixtures to remain. no structural. | $6,000 |
| Dec 3, 2007 | Completed final sign-off Jan 2008 | 3618 22nd St | remodel bathroom at 3618 22nd st#4. remodel bathroom and kitchen at 3618 22nd st#22.Details
remodel bathroom at 3618 22nd st#4. remodel bathroom and kitchen at 3618 22nd st#22. | $20,900 |
| Mar 26, 2001 | Completed final sign-off Apr 2001 | 168 Onondaga Av | 1 bathroom remodeling. no structural work.Details
1 bathroom remodeling. no structural work. | $4,000 |