Back to kitchen remodel contractors
J&J Dynamic Construction Inc
- Based in
- Concord
- On San Francisco permits
- Sep 2022 to Sep 2026
- Last 24 months
- 17 permits filed
27 permits since 2000: 20 completed, 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
21 kitchen remodel permits: 17 completed, 4 in progress. Typically 0 days from filing to permit and 73 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 435 Urbano Dr | kitchen remodel. new drywall & lighting throughout entire home. remove e. load-bearing wall in kitchen. 4 bath's remodel. re-frame e. stairs between 1st & 2nd floor due to deterioration. new tankless w/h in crawl space. n. fau in crawl space & 2nd. n. fau in attic of roof. replace 13 e. windows &Details
kitchen remodel. new drywall & lighting throughout entire home. remove e. load-bearing wall in kitchen. 4 bath's remodel. re-frame e. stairs between 1st & 2nd floor due to deterioration. new tankless w/h in crawl space. n. fau in crawl space & 2nd. n. fau in attic of roof. replace 13 e. windows & | $120,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 126 Aptos Av | kitchen remodel with (n) pantry,2 bath remodel.(n)3rd bath on 3rd fl &(n)4th bath on 1st floor,2(n)bedrooms on 1st floor.(n)tankless w/h.(n)packaged heat pump unit w/ 8 blowers.replace 34(e)windows like for like.replace 1dbl-french doors & 2 single french doors.(n)125a-sub panelDetails
kitchen remodel with (n) pantry,2 bath remodel.(n)3rd bath on 3rd fl &(n)4th bath on 1st floor,2(n)bedrooms on 1st floor.(n)tankless w/h.(n)packaged heat pump unit w/ 8 blowers.replace 34(e)windows like for like.replace 1dbl-french doors & 2 single french doors.(n)125a-sub panel | $45,000 |
| May 15, 2026 | In progress issued May 2026 | 126 Aptos Av | remodel 1 kitchen and 1 bath, like for like.Details
remodel 1 kitchen and 1 bath, like for like. | $5,000 |
| Feb 25, 2026 | In progress issued Feb 2026 | 36 Broderick St | relocate kitchen to (e) family room on 1st flr and remodel 3 baths. (n) 125a subpanel on 1st flr. replace 9 (e) windows, 1 (e) sliding glass door and entry door with side-lites, like for like on 1st flr. replace 8 (e) windows like for like on 2nd flr. replace (e) 1 fau in garage at ground flr.Details
relocate kitchen to (e) family room on 1st flr and remodel 3 baths. (n) 125a subpanel on 1st flr. replace 9 (e) windows, 1 (e) sliding glass door and entry door with side-lites, like for like on 1st flr. replace 8 (e) windows like for like on 2nd flr. replace (e) 1 fau in garage at ground flr. | $50,000 |
| Jan 6, 2026 | Completed final sign-off Apr 2026 | 249 Gold Mine Dr | to comply to nov 202548879 demo existing kitchen and renovate new kitchen. demo 2 bathrooms and renovate new bathrooms. work and install new 125 amp subpanel. replacing 8 windows and 2 sliding glass doors like for like. den on 1st fl to be bedroom with new bath.front windows to be wood clad.Details
to comply to nov 202548879 demo existing kitchen and renovate new kitchen. demo 2 bathrooms and renovate new bathrooms. work and install new 125 amp subpanel. replacing 8 windows and 2 sliding glass doors like for like. den on 1st fl to be bedroom with new bath.front windows to be wood clad. | $50,000 |
| Dec 4, 2025 | Completed final sign-off Feb 2026 | 376 Corbett Av | demo (e) kitchen & renovate kitchen in like for like design. demo hall bathroom, shower, and flooring and install new tile floor and custom shower pan with tile shower wall. demo upstairs bathroom and renovate bathroom/tub in like for like design. installation of new 125 amp subpanel.remodel in-kindDetails
demo (e) kitchen & renovate kitchen in like for like design. demo hall bathroom, shower, and flooring and install new tile floor and custom shower pan with tile shower wall. demo upstairs bathroom and renovate bathroom/tub in like for like design. installation of new 125 amp subpanel.remodel in-kind | $40,000 |
| Aug 19, 2025 | Completed final sign-off Sep 2025 | 1970 35th Av | kitchen remodel, bathroom remodel. remove (e) load bearing wall in kitchen and replace with a new wood beam, wood post at each end, and new pad foundations.Details
kitchen remodel, bathroom remodel. remove (e) load bearing wall in kitchen and replace with a new wood beam, wood post at each end, and new pad foundations. | $55,000 |
| Jun 30, 2025 | Completed final sign-off Aug 2025 | 419 Capistrano Av | kitchen & 1 bathroom remodel with removal and replacement of all fixtures, like for like. no removal of wallsDetails
kitchen & 1 bathroom remodel with removal and replacement of all fixtures, like for like. no removal of walls | $28,000 |
| Jun 23, 2025 | Completed final sign-off Aug 2025 | 3781 25th St | kitchen and bath remodel with removal and replacement of all fixtures. add new master bathroom with (e) footprint, create new closet in bedroom and add new opening to hallway.Details
kitchen and bath remodel with removal and replacement of all fixtures. add new master bathroom with (e) footprint, create new closet in bedroom and add new opening to hallway. | $40,000 |
| Feb 18, 2025 | Completed final sign-off Apr 2025 | 150 De Soto St | kitchen remodel with the removal and replacement of all fixtures. 1/f bath remodel with the removal and replacement of all fixtures. replace (1) window in bath. reconfigure layout and remodel 2/f shared bath. create new master bath and wic at upper level bedroom. remove 4 windows.Details
kitchen remodel with the removal and replacement of all fixtures. 1/f bath remodel with the removal and replacement of all fixtures. replace (1) window in bath. reconfigure layout and remodel 2/f shared bath. create new master bath and wic at upper level bedroom. remove 4 windows. | $80,000 |
| Dec 23, 2024 | Completed final sign-off Jul 2025 | 281 Castro St | unit a-remodel kitchen and bathroom in kind . no wall removal or layout change. kitchen approx. 150 sq ft. bathroom approx. 54 sq ft.Details
unit a-remodel kitchen and bathroom in kind . no wall removal or layout change. kitchen approx. 150 sq ft. bathroom approx. 54 sq ft. | $28,000 |
| Dec 23, 2024 | Completed final sign-off Jul 2025 | 281 Castro St | unit 281 castro st (front of property) -remodel kitchen (200 sf) and primary bathroom (150 sf) and one jack and jill bathroom (75 sf) and one powder room/laundry room (90 sf). replace rear window in primary bathroom. install (n) 125amp subpanel for kitchen circuit. install (n) master suite.Details
unit 281 castro st (front of property) -remodel kitchen (200 sf) and primary bathroom (150 sf) and one jack and jill bathroom (75 sf) and one powder room/laundry room (90 sf). replace rear window in primary bathroom. install (n) 125amp subpanel for kitchen circuit. install (n) master suite. | $45,000 |
| Jun 18, 2024 | Completed final sign-off Aug 2024 | 2453 Diamond St | kitchen remodel with the removal and replacement of all fixtures, in kind. remove vanity in bathroom, in kind. (n) lighting in living. remove stucco on front elevation and provide stucco. replace (4) windows like for like (1) facing street (3) rear uf<0.3.Details
kitchen remodel with the removal and replacement of all fixtures, in kind. remove vanity in bathroom, in kind. (n) lighting in living. remove stucco on front elevation and provide stucco. replace (4) windows like for like (1) facing street (3) rear uf<0.3. | $45,000 |
| Apr 23, 2024 | Completed final sign-off May 2024 | 30 Stoneybrook Av | kitchen remodel. bath remodel and new lighting in living roomDetails
kitchen remodel. bath remodel and new lighting in living room | $35,000 |
| Jan 19, 2024 | Completed final sign-off Jun 2024 | 260 Santa Clara Av | kitchen remodel with the removal and replacement of all fixtures; 2 baths remodel with the removal and replacement of all fixtures; add a new masterbath to new location and existing both to be walk in closet; replace 1 1 window like for like in the master bathDetails
kitchen remodel with the removal and replacement of all fixtures; 2 baths remodel with the removal and replacement of all fixtures; add a new masterbath to new location and existing both to be walk in closet; replace 1 1 window like for like in the master bath | $60,000 |
| Nov 30, 2023 | Completed final sign-off Jan 2024 | 122 Lee Av | interior bath and kitchen remodel involving the removal and replacement of all fixtures. lighting throughout residence. remove and replace (3) windows like for like -not street visible.Details
interior bath and kitchen remodel involving the removal and replacement of all fixtures. lighting throughout residence. remove and replace (3) windows like for like -not street visible. | $45,000 |
| Aug 24, 2023 | Completed final sign-off Nov 2023 | 834 47th Av | interior bath & kitchen remodel involving removal & replacement of all fixtures, new lighting throughout residence, remove & replace windows (8) like for like per plan.Details
interior bath & kitchen remodel involving removal & replacement of all fixtures, new lighting throughout residence, remove & replace windows (8) like for like per plan. | $45,000 |
| Mar 29, 2023 | Completed final sign-off Sep 2023 | 150 Dartmouth St | kitchen remodel like for like, remodel existing bath to become new masterbath and new common bath, replace 1-window in kitchen and 1-window in bedroom (not street facing), replace 4 light fixtures. remove window @ bath and infillDetails
kitchen remodel like for like, remodel existing bath to become new masterbath and new common bath, replace 1-window in kitchen and 1-window in bedroom (not street facing), replace 4 light fixtures. remove window @ bath and infill | $38,000 |
| Nov 29, 2022 | Completed final sign-off Dec 2022 | 128 Wood St | revision to pa#202210174507 -paint interior, kitchen renovation , new cabinetry, countrtop, kitchen design. like for like . new flooring install. no structural work no framing(revision is remove bath remodel from scope of 202210174807)Details
revision to pa#202210174507 -paint interior, kitchen renovation , new cabinetry, countrtop, kitchen design. like for like . new flooring install. no structural work no framing(revision is remove bath remodel from scope of 202210174807) | |
| Oct 17, 2022 | Completed final sign-off Dec 2022 | 128 Wood St | paint interior, bathroom renovation (existing lay out) like for like- kitchen renovation (new cab- countertop flooring) like for like new lvp flooring. no structural work - no framing modificaiton.Details
paint interior, bathroom renovation (existing lay out) like for like- kitchen renovation (new cab- countertop flooring) like for like new lvp flooring. no structural work - no framing modificaiton. | $60,000 |
| Sep 16, 2022 | Completed final sign-off Mar 2023 | 212 Lexington St | interior remodel: all bedrooms, living rooms, bathrooms, and kitchen. electrical and plumbing to be updated. replace all existing windows like for like with same dimensions, details and exterior materials.Details
interior remodel: all bedrooms, living rooms, bathrooms, and kitchen. electrical and plumbing to be updated. replace all existing windows like for like with same dimensions, details and exterior materials. | $80,000 |