J. Handa Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2002 to Aug 2019
- Last 24 months
- 0 permits filed
49 permits since 2000: 46 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 6 completed, 2 never finaled. Typically 0 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2010 | Completed final sign-off Apr 2011 | 106 Amber Dr | complete replacement of an existing wood deck at rear, same size & location.Details
complete replacement of an existing wood deck at rear, same size & location. | $12,000 |
| Feb 3, 2009 | Completed final sign-off Sep 2009 | 1811 Sutter St | wood frame deck maintenance. replacment of partially decayed framing members, tie ins to the main residence and foundation improvments as required to accomodate the above grade maintenance.Details
wood frame deck maintenance. replacment of partially decayed framing members, tie ins to the main residence and foundation improvments as required to accomodate the above grade maintenance. | $9,000 |
| Apr 24, 2007 | Never finaled issued Apr 2007, no final | 319 Locust St | repair of damaged wood decking at (e) deck. less than 50% of structural at rear.Details
repair of damaged wood decking at (e) deck. less than 50% of structural at rear. | $3,000 |
| Jan 29, 2007 | Completed final sign-off Jun 2007 | 2056 Bush St | repair of damage existing deck. less than 50% of structural at rear.Details
repair of damage existing deck. less than 50% of structural at rear. | $1,000 |
| Jul 26, 2005 | Completed final sign-off Oct 2005 | 1168 Church St | remove (e) rear stair, deck and landings & replace with new. replacement of (e) required second meanDetails
remove (e) rear stair, deck and landings & replace with new. replacement of (e) required second mean | $17,000 |
| Sep 29, 2004 | Completed final sign-off Dec 2004 | 530 Rhode Island St | repair damaged wood decking at (e) deck less than 50% repair in kindDetails
repair damaged wood decking at (e) deck less than 50% repair in kind | $1,000 |
| Oct 14, 2003 | Never finaled issued Oct 2003, no final | 4205 22nd St | repair damaged wood decking @ (e) deck, less than 50% of structureDetails
repair damaged wood decking @ (e) deck, less than 50% of structure | $1,000 |
| Nov 12, 2002 | Completed final sign-off Dec 2003 | 1965 Bush St | remove (e)dry rot joist & repl w/new at (e)2nd and 3rd flr rear decksDetails
remove (e)dry rot joist & repl w/new at (e)2nd and 3rd flr rear decks | $9,000 |