Back to bathroom remodel contractors
J. Handa Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2002 to Aug 2019
- Last 24 months
- 0 permits filed
49 permits since 2000: 46 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 290 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 20, 2017 | Completed final sign-off Oct 2018 | 2338 Pine St | 2nd floor, unit #2: remodel existing kitchen and bathroom. replace cabinets and countertop, in-kind. no structural work. no wall removal. maher n/aDetails
2nd floor, unit #2: remodel existing kitchen and bathroom. replace cabinets and countertop, in-kind. no structural work. no wall removal. maher n/a | $30,000 |
| Jan 13, 2017 | Completed final sign-off Jun 2017 | 546 Flood Av | remodel (e) bathroom, install bathtub & shower, toilet, vanity cabinet with faucet, no walls moved.Details
remodel (e) bathroom, install bathtub & shower, toilet, vanity cabinet with faucet, no walls moved. | $17,000 |
| Feb 8, 2016 | Completed final sign-off Feb 2018 | 2338 Pine St | 3/f, unit 5: remodel (e) kitchen & bathroom; replace cabinets & countertop in-kind; no structural work; no wall removal. no wall moved/removed/added/infilled. all (e) layouts to remain unchanged. compliance with maher ordinance no 155-13 not required.Details
3/f, unit 5: remodel (e) kitchen & bathroom; replace cabinets & countertop in-kind; no structural work; no wall removal. no wall moved/removed/added/infilled. all (e) layouts to remain unchanged. compliance with maher ordinance no 155-13 not required. | $20,000 |
| Dec 8, 2014 | Completed final sign-off Sep 2015 | 59 Collingwood St | unit 2, 3 & 4- remodel kitchens and bathrooms ; replace cabinets and countertops in kind. no structural work. no wall removal. work on 2 & 3/f. to comply with cec150.0(k)3 & 5Details
unit 2, 3 & 4- remodel kitchens and bathrooms ; replace cabinets and countertops in kind. no structural work. no wall removal. work on 2 & 3/f. to comply with cec150.0(k)3 & 5 | $60,000 |
| Mar 5, 2010 | Completed final sign-off Apr 2010 | 2178 14th Av | bathroom addition adjacent to existing bedroom at the rear of garage level. new work is interior and non structural. new walls constructed adjacent to garage. shall be 1 hour constructionDetails
bathroom addition adjacent to existing bedroom at the rear of garage level. new work is interior and non structural. new walls constructed adjacent to garage. shall be 1 hour construction | $7,200 |