Back to kitchen remodel contractors
J Farley Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2022 to Sep 2026
- Last 24 months
- 13 permits filed
19 permits since 2000: 13 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 2 in progress. Typically 2 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2026 | Completed final sign-off Jun 2026 | 1990 Green St | unit 205: replace kitchen cabinets, keeping layout. remodel bathroom, convert tub to shower. no removal of wallsDetails
unit 205: replace kitchen cabinets, keeping layout. remodel bathroom, convert tub to shower. no removal of walls | $50,000 |
| Sep 22, 2025 | Completed final sign-off Dec 2025 | 711 Kansas St | add new bathroom, remodel existing bathroom, remodel kitchen, upgrade electrical. (n) door in garageDetails
add new bathroom, remodel existing bathroom, remodel kitchen, upgrade electrical. (n) door in garage | $65,000 |
| Sep 16, 2025 | In progress issued Sep 2025 | 711 Kansas St | floor protection and exploration demolition in kitchen and bathroomDetails
floor protection and exploration demolition in kitchen and bathroom | $2,500 |
| May 22, 2025 | In progress issued Jun 2025 | 33 Retiro Wy | addition of 49 sqft with the infill of interior lightwell at second fl. remodel kitchen and bathroom. two new skylights at kitchen. no change to exterior.Details
addition of 49 sqft with the infill of interior lightwell at second fl. remodel kitchen and bathroom. two new skylights at kitchen. no change to exterior. | $125,000 |
| Jan 2, 2025 | Completed final sign-off Jul 2025 | 464 Los Palmos Dr | interior remodel of sfd provide lighting for 2nd and 3rd floors kitchen remodel new windows at kitchen not visible provide new skylight at kitchen replace (e) windows at dining with french doors not visible from street replace rim blocks with psl rim joist at 3rd floor overhangDetails
interior remodel of sfd provide lighting for 2nd and 3rd floors kitchen remodel new windows at kitchen not visible provide new skylight at kitchen replace (e) windows at dining with french doors not visible from street replace rim blocks with psl rim joist at 3rd floor overhang | $20,000 |
| Sep 1, 2023 | Completed final sign-off Dec 2024 | 2595 14th Av | remodel kitchen, new countertop, backsplash, new appliances. repair cabinets to fit new microwave and oven.Details
remodel kitchen, new countertop, backsplash, new appliances. repair cabinets to fit new microwave and oven. | $10,000 |