Back to kitchen remodel contractors
J Cortes Construction
- Based in
- El Sobrante
- On San Francisco permits
- Dec 2022 to Mar 2023
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 243 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2022 | Completed final sign-off Aug 2023 | 1914 Filbert St | interior renovation of kitchen and (2) baths, in kind. new recessed led lights in bathrooms and kitchen. replace (e) recessed led lights and flush-mount ceiling lights with new in kind. replace (e) rear yard-facing vinyl window in primary bath with new vinyl window. no changes to existing wall locatDetails
interior renovation of kitchen and (2) baths, in kind. new recessed led lights in bathrooms and kitchen. replace (e) recessed led lights and flush-mount ceiling lights with new in kind. replace (e) rear yard-facing vinyl window in primary bath with new vinyl window. no changes to existing wall locat | $145,000 |