Back to kitchen remodel contractors
J A P Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to Jan 2026
- Last 24 months
- 1 permit filed
31 permits since 2000: 27 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 12 completed, 1 never finaled. Typically 0 days from filing to permit and 239 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 28, 2026 | Completed final sign-off Sep 2026 | 58 Auburn St | existing kitchen remodel, like for like.Details
existing kitchen remodel, like for like. | $24,000 |
| Sep 3, 2024 | Completed final sign-off May 2026 | 225 Stanyan St | remove portion of structure walls, create larger kitchen. convert (e) living room to a bedroom with bathroom.Details
remove portion of structure walls, create larger kitchen. convert (e) living room to a bedroom with bathroom. | $78,800 |
| Feb 7, 2020 | Completed final sign-off Jan 2021 | 600 Alvarado St | relocate entry door to unit #3, add closets, kitchen and bathroom remodel at unt #3Details
relocate entry door to unit #3, add closets, kitchen and bathroom remodel at unt #3 | $25,000 |
| Feb 5, 2020 | Completed final sign-off Jan 2022 | 600 Alvarado St | unit 2 - relocate entry door, remove (e) pantry & closet, bathroom & kitchen interior remodelDetails
unit 2 - relocate entry door, remove (e) pantry & closet, bathroom & kitchen interior remodel | $35,000 |
| Jan 30, 2020 | Completed final sign-off Jan 2021 | 600 Alvarado St | unit #1: relocate entry door, add new closets, kitchen and bathroom interior remodel. new storage in common area at 1st floor.Details
unit #1: relocate entry door, add new closets, kitchen and bathroom interior remodel. new storage in common area at 1st floor. | $25,000 |
| Nov 6, 2019 | Completed final sign-off Jan 2020 | 54 Auburn St | (e) kitchen remodeling 110 sqft amd bathroom on 3rd floor repair plaster and cracks in walls. repair floor.Details
(e) kitchen remodeling 110 sqft amd bathroom on 3rd floor repair plaster and cracks in walls. repair floor. | $8,500 |
| Oct 28, 2019 | Completed final sign-off Jan 2021 | 600 Alvarado St | kitchen remodel 120 sq ft, bathroom remodel 37 sq ft. replace plaster to walls as needed w/ 5/8" type x drywall and kitchen and bathroomDetails
kitchen remodel 120 sq ft, bathroom remodel 37 sq ft. replace plaster to walls as needed w/ 5/8" type x drywall and kitchen and bathroom | $48,000 |
| Jul 9, 2018 | Never finaled issued Jul 2018, no final | 207 Congo St | kitchen remodel - replace existing kitchen cabinets.Details
kitchen remodel - replace existing kitchen cabinets. | $9,000 |
| Apr 17, 2017 | Completed final sign-off Dec 2017 | 600 Alvarado St | unit 4: remodel (e) kitchen, replace cabinets, sink, garbage disposal, electrical outlets, kitchen hood.Details
unit 4: remodel (e) kitchen, replace cabinets, sink, garbage disposal, electrical outlets, kitchen hood. | $17,000 |
| Feb 27, 2017 | Completed final sign-off Apr 2017 | 600 Alvarado St | (e) kitchen remodeling, replace of cabinets, sink, garbage disposal and electrical outlets.Details
(e) kitchen remodeling, replace of cabinets, sink, garbage disposal and electrical outlets. | $12,000 |
| Sep 15, 2015 | Completed final sign-off Jan 2016 | 901 South Van Ness Av | provide automatic door opeer for entry door, remodel (e) toilets to comply with ada, no change in kitchen & dining, no exterior change.Details
provide automatic door opeer for entry door, remodel (e) toilets to comply with ada, no change in kitchen & dining, no exterior change. | $15,000 |
| Jun 19, 2013 | Completed final sign-off Jul 2013 | 600 Alvarado St | unit #3: remove & replace existing kitchen, cabinets, d/w, sink, stove, refrigerator, etc. remove partial existing non-bearing wall between kitchen and hallwayDetails
unit #3: remove & replace existing kitchen, cabinets, d/w, sink, stove, refrigerator, etc. remove partial existing non-bearing wall between kitchen and hallway | $10,000 |
| Sep 10, 2010 | Completed final sign-off Apr 2011 | 1190 Alabama St | to remodel existing bathroom, lights on t-24, to remove existing kitchen, min 50% lighting watt in h.e. lights, no wall removedDetails
to remodel existing bathroom, lights on t-24, to remove existing kitchen, min 50% lighting watt in h.e. lights, no wall removed | $28,000 |