J & A General Construction
- Based in
- Millbrae
- On San Francisco permits
- Jan 2024 to Dec 2025
- Last 24 months
- 5 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 0 days from filing to permit and 110 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2025 | Completed final sign-off Mar 2026 | 300 Carl St | repair stairs less than 50%, back of bldg common area. to comply with inspection report ca sb 721., not street visible.Details
repair stairs less than 50%, back of bldg common area. to comply with inspection report ca sb 721., not street visible. | $5,000 |
| Dec 3, 2025 | Completed final sign-off Apr 2026 | 2045 Hayes St | to comply with inspection report cc sb 721: repair less than 50% wooden staircase, non street visible.Details
to comply with inspection report cc sb 721: repair less than 50% wooden staircase, non street visible. | $2,500 |
| Oct 31, 2025 | Completed final sign-off Dec 2025 | 165 Duboce Av | replace less than 50% of dry rot on wooden stairway per ca sb-721 inspection report. not street visible. all repairs to be in kind.Details
replace less than 50% of dry rot on wooden stairway per ca sb-721 inspection report. not street visible. all repairs to be in kind. | $6,000 |