Back to kitchen remodel contractors
J A Design And Construction Inc
- Based in
- Lafayette
- On San Francisco permits
- Jan 2013 to Apr 2024
- Last 24 months
- 0 permits filed
19 permits since 2000: 14 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 19, 2022 | Completed final sign-off Aug 2022 | 1250 Clay St | revisioin to pa# 201810183605. kitchen and bath remodel. remove the pharse "replace 4 windows and 1 slider" in the scope of work. replace (e) stove with cook top and oven, change wall hung toilet to floor toilet, using (e) drain. #105Details
revisioin to pa# 201810183605. kitchen and bath remodel. remove the pharse "replace 4 windows and 1 slider" in the scope of work. replace (e) stove with cook top and oven, change wall hung toilet to floor toilet, using (e) drain. #105 | |
| Apr 20, 2021 | Never finaled issued Apr 2021, no final | 1230 Clay St | one bath & kitchen remodeling:replace kitchen cabinets,appliances, lighting,update elec & plum as needed in kitchen.update fixtures in bathroom, new lighting,update electrical tile in both rooms, new flooring,new electrical panel to accomodate new circuits.no change in layout of walls & openings.Details
one bath & kitchen remodeling:replace kitchen cabinets,appliances, lighting,update elec & plum as needed in kitchen.update fixtures in bathroom, new lighting,update electrical tile in both rooms, new flooring,new electrical panel to accomodate new circuits.no change in layout of walls & openings. | $42,000 |
| Oct 18, 2018 | Completed final sign-off Aug 2022 | 1250 Clay St | remodel kitchen/bath no partition demo replace 4 windows + 1 slider (no visible from the street) all work in unit no work in common areas. no increase to area or height.Details
remodel kitchen/bath no partition demo replace 4 windows + 1 slider (no visible from the street) all work in unit no work in common areas. no increase to area or height. | $40,000 |
| Oct 5, 2017 | Completed final sign-off Mar 2018 | 1250 Clay St | remodel bath, replace (e) fixtures, replace kitchen cabinets and countertops, sink, faucet, appliances. no hood. n/a ordinance #155-13Details
remodel bath, replace (e) fixtures, replace kitchen cabinets and countertops, sink, faucet, appliances. no hood. n/a ordinance #155-13 | $27,000 |
| Sep 30, 2014 | Completed final sign-off Dec 2015 | 1170 Sacramento St | wall furring, av, lighting, flooring, drywall, kitchen counters and sink. no structural, no new opening on walls.Details
wall furring, av, lighting, flooring, drywall, kitchen counters and sink. no structural, no new opening on walls. | $65,000 |
| Mar 27, 2014 | Completed final sign-off Nov 2014 | 6620 Geary Bl | remodel 2 baths and 1 kitchen, no structuralDetails
remodel 2 baths and 1 kitchen, no structural | $27,000 |