Back to kitchen remodel contractors
J & A Construction
- Based in
- Castro Valley
- On San Francisco permits
- Apr 2026 to Aug 2026
- Last 24 months
- 3 permits filed
3 permits since 2000: 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 in progress. Typically 8 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2026 | In progress issued Aug 2026 | 1871 45th Av | rear horizontal addition and interior remodel. 1st fl. add a guest room, a full bathroom, a family room with wet bar. 2nd fl. remodel (e) bedrooms, kitchen bathroom. add a bath.Details
rear horizontal addition and interior remodel. 1st fl. add a guest room, a full bathroom, a family room with wet bar. 2nd fl. remodel (e) bedrooms, kitchen bathroom. add a bath. | $280,000 |
| May 13, 2026 | In progress issued May 2026 | 1266 20th Av | #rear bldg: remodel (e) kitchen and bathroom at 2nd floor. no wall remove.Details
#rear bldg: remodel (e) kitchen and bathroom at 2nd floor. no wall remove. | $50,000 |
| Apr 8, 2026 | In progress issued Sep 2026 | 519 22nd Av | two story rear addition: infill lightwell on south side, reconfigure interior stairs. 1st floor add 1 bedroom , family room , 1 full bath, deck at rear. 2nd floor remodel kitchen and bathroom. 3rd floor remodel bathroom, add 1 full bath, cantilever deck at rear.Details
two story rear addition: infill lightwell on south side, reconfigure interior stairs. 1st floor add 1 bedroom , family room , 1 full bath, deck at rear. 2nd floor remodel kitchen and bathroom. 3rd floor remodel bathroom, add 1 full bath, cantilever deck at rear. | $380,000 |