Ivan Alberto Rivera Rivas
- Based in
- Colma
- On San Francisco permits
- Jun 2011 to Sep 2026
- Last 24 months
- 8 permits filed
87 permits since 2000: 67 completed, 5 in progress, 12 never finaled, 3 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 7 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 7 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 288 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2020 | Completed final sign-off Jan 2021 | 2139 18th Av | replacement of existing dry rot entry stairs in same location.Details
replacement of existing dry rot entry stairs in same location. | $6,000 |
| Dec 31, 2019 | Completed final sign-off Jan 2021 | 2139 18th Av | inkind front stair and surrounding siding repairDetails
inkind front stair and surrounding siding repair | $6,000 |
| Aug 14, 2019 | Completed final sign-off Mar 2024 | 775 Vermont St | comply to correct complaint #201899601. access for roof/solar equipment access. legalize steel spiral roof access ladder stair post installed on conc pad footing.Details
comply to correct complaint #201899601. access for roof/solar equipment access. legalize steel spiral roof access ladder stair post installed on conc pad footing. | $5,000 |
| Jul 30, 2018 | Completed final sign-off May 2019 | 2350 Market St | reconfiguration of building exit stairways, new stairway to exist mezzanine, reconsturction of street facade, new roof deckDetails
reconfiguration of building exit stairways, new stairway to exist mezzanine, reconsturction of street facade, new roof deck | $30,000 |
| Sep 26, 2017 | Completed final sign-off Sep 2018 | 1282 16th Av | existing rear deck upgrade with new exit stair to rear yard. legalize (e) bathroom on ground floorDetails
existing rear deck upgrade with new exit stair to rear yard. legalize (e) bathroom on ground floor | $80,000 |
| Mar 6, 2017 | Completed final sign-off May 2018 | 2179 41st Av | revision to 201106077540 201701308198: remove bay window and add triple window at rear of building on each of the two upper levels. change direction of 1st flr stairsDetails
revision to 201106077540 201701308198: remove bay window and add triple window at rear of building on each of the two upper levels. change direction of 1st flr stairs | $3,000 |
| Dec 1, 2016 | Expired or cancelled cancelled Sep 2025 | 535 Cordova St | illegal unit removal and proposed interior garage access stairs in original location.Details
illegal unit removal and proposed interior garage access stairs in original location. | $20,000 |
| Oct 12, 2016 | Never finaled issued Oct 2016, no final | 535 Cordova St | demolition of kitchen wall and partial kitchen area down stairs to create new stairs to access basement (under seperate permit). demo only.Details
demolition of kitchen wall and partial kitchen area down stairs to create new stairs to access basement (under seperate permit). demo only. | $5,000 |
| Mar 30, 2015 | Completed final sign-off May 2015 | 1313 Palou Av | comply w/nov #200715010, 8-15-07 items 2,3,4: repair less than 50% stairs.Details
comply w/nov #200715010, 8-15-07 items 2,3,4: repair less than 50% stairs. | $3,000 |