Back to kitchen remodel contractors
Irwin Fisher Inc
- Based in
- Redwood City
- On San Francisco permits
- Feb 2002 to Feb 2023
- Last 24 months
- 0 permits filed
34 permits since 2000: 22 completed, 3 never finaled, 9 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2016 | Completed final sign-off Jun 2024 | 40 Montclair Tr | remodel w/ vertical/horizontal addition, facade alternation, roof deck, new entry foyer and bedroomexpansion, vertical addition will contain stair, study, kitchen and bedroom.Details
remodel w/ vertical/horizontal addition, facade alternation, roof deck, new entry foyer and bedroomexpansion, vertical addition will contain stair, study, kitchen and bedroom. | $180,000 |
| Jun 20, 2016 | Completed final sign-off Nov 2016 | 324 Pacheco St | kitchen remodel: demo cabinetry and drywall, rework electrical-lighting & outlet changes.relocate gas line & kit sink,relocate kit hood to roof. change beam from dropped to flush beam approx 10' length,new drywall/cabinetry.Details
kitchen remodel: demo cabinetry and drywall, rework electrical-lighting & outlet changes.relocate gas line & kit sink,relocate kit hood to roof. change beam from dropped to flush beam approx 10' length,new drywall/cabinetry. | $201,000 |
| Aug 4, 2005 | Completed final sign-off Nov 2005 | 331 Filbert St | install cooktop & refer in studio unit 1st floor in kitchen. install cooktop in 2nd floor kitchenDetails
install cooktop & refer in studio unit 1st floor in kitchen. install cooktop in 2nd floor kitchen | $2,500 |
| May 19, 2004 | Expired or cancelled expired Jan 2006 | 52 Saturn St | demo 2 bathrooms & kitchen down to studs. new elect & plumb. as required. install 5/8" as req, relocDetails
demo 2 bathrooms & kitchen down to studs. new elect & plumb. as required. install 5/8" as req, reloc | $200,000 |