Back to kitchen remodel contractors
Ippolito Renovations A Partnership
- Based in
- Oakley
- On San Francisco permits
- Mar 2014 to Mar 2014
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 73 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2014 | Completed final sign-off Jun 2014 | 1000 Powell St | basic kitchen remodel, same layout & design, upgrade electrical outet and lights, upgrade shower valve and all angle stops. replace kitchen cabinets & counter top and bathroom floor tile & surround. basic remodel on bath w/same layout & design. no structural. kitchen - 50% high efficacy & bathroomDetails
basic kitchen remodel, same layout & design, upgrade electrical outet and lights, upgrade shower valve and all angle stops. replace kitchen cabinets & counter top and bathroom floor tile & surround. basic remodel on bath w/same layout & design. no structural. kitchen - 50% high efficacy & bathroom | $15,000 |