Back to kitchen remodel contractors
Inspired Builders Inc.
- Based in
- Santa Clara
- On San Francisco permits
- Dec 2022 to Aug 2026
- Last 24 months
- 25 permits filed
30 permits since 2000: 20 completed, 7 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 8 completed, 4 in progress. Typically 0 days from filing to permit and 82 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | In progress issued Aug 2026 | 125 Sutro Heights Av | kitchen like for like, no structural changes. replace cabinets, sink dishwasher. bathroom remodel like for like, no structural changes. replace toilets (2), sinks (2), replace fan.Details
kitchen like for like, no structural changes. replace cabinets, sink dishwasher. bathroom remodel like for like, no structural changes. replace toilets (2), sinks (2), replace fan. | $60,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 1521 Anza St | kitchen remodel-like for like, no structural changes. replace cabinets, dishwasher, sink, all in same location in the kitchen. upgade mep to code as neededDetails
kitchen remodel-like for like, no structural changes. replace cabinets, dishwasher, sink, all in same location in the kitchen. upgade mep to code as needed | $20,000 |
| May 1, 2026 | In progress issued May 2026 | 100 Encline Ct | kitchen and 2x bathroom remodel to include replace gas cooktop for range and update all fixtures and finishes. replace shower for free standing shower and add (n) master bathroom. include (n) subpanelDetails
kitchen and 2x bathroom remodel to include replace gas cooktop for range and update all fixtures and finishes. replace shower for free standing shower and add (n) master bathroom. include (n) subpanel | $70,000 |
| Mar 10, 2026 | Completed final sign-off Aug 2026 | 45 Stonecrest Dr | partial kitchen remodel in kind - remove countertops throughout kitchen, remove (e) appliances and fixtures. install new appliances and fixtures. install new countertops. upgrade outlets to new gfci, at backsplash. all in kind. no change to floor layout. no change to wall layout. no structural workDetails
partial kitchen remodel in kind - remove countertops throughout kitchen, remove (e) appliances and fixtures. install new appliances and fixtures. install new countertops. upgrade outlets to new gfci, at backsplash. all in kind. no change to floor layout. no change to wall layout. no structural work | $15,000 |
| Feb 25, 2026 | Completed final sign-off Jun 2026 | 493 Diamond St | project consist of a kitchen and dining room remodel with (n) exterior doors and windows and minor sturctural remodel. no work visible from street.Details
project consist of a kitchen and dining room remodel with (n) exterior doors and windows and minor sturctural remodel. no work visible from street. | $30,000 |
| Aug 22, 2025 | Completed final sign-off Nov 2025 | 318 Vicksburg St | kitchen remodel like for like. 97 sq ft.Details
kitchen remodel like for like. 97 sq ft. | $30,000 |
| May 8, 2025 | In progress issued Feb 2026 | 606 Mississippi St | 1st floor modify existing building - rear addition to add new kitchen and living area. approx 342 sq ft 2nd floor - also demolition of a (e) walk in closet area and interior modifications.Details
1st floor modify existing building - rear addition to add new kitchen and living area. approx 342 sq ft 2nd floor - also demolition of a (e) walk in closet area and interior modifications. | $168,800 |
| Mar 21, 2025 | Completed final sign-off Mar 2025 | 592 Wildwood Wy | revision to permit 202412207219. kitchen remodel has been removed from scope of work.Details
revision to permit 202412207219. kitchen remodel has been removed from scope of work. | |
| Feb 12, 2025 | Completed final sign-off Apr 2025 | 2458 44th Av | kitchen like for like & 1 bathroom like for like convert tub to showerDetails
kitchen like for like & 1 bathroom like for like convert tub to shower | $45,000 |
| Dec 20, 2024 | Completed final sign-off Mar 2025 | 592 Wildwood Wy | laundry room: add new cabinets & sink to (e). kitchen remodel in kind -rip & replace like for like. install ev charger in garageDetails
laundry room: add new cabinets & sink to (e). kitchen remodel in kind -rip & replace like for like. install ev charger in garage | $40,000 |
| Apr 2, 2024 | Completed final sign-off Sep 2024 | 65 Lomita Av | remodel of e single family dwelling to reconfigure kitchen and master bedroom closet. removal of bearing wall in kitchen. removal of e hall bath. convert lower storage room into a new bedroom and bathDetails
remodel of e single family dwelling to reconfigure kitchen and master bedroom closet. removal of bearing wall in kitchen. removal of e hall bath. convert lower storage room into a new bedroom and bath | $80,000 |
| Oct 5, 2023 | Completed final sign-off Dec 2023 | 432 Collingwood St | unit a: 1 kitchen remodel like for like. install subpanel. install 21 recessed lights throughout the house.Details
unit a: 1 kitchen remodel like for like. install subpanel. install 21 recessed lights throughout the house. | $40,000 |