In&Out Plumbing And Construction
- Based in
- South San Francisco
- On San Francisco permits
- Nov 2014 to Aug 2026
- Last 24 months
- 5 permits filed
17 permits since 2000: 8 completed, 4 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 in progress. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Aug 2026 | 1367 Rhode Island St | less than 50% repair at the front: remove (e) terrazo and brick stairs to fix existing damaged. waterproof membrane and replace with grace waterproof membrane. repair any dry rotted spots on the plywood and landings. new stairs replace with split red bricks. no terrazzo back.Details
less than 50% repair at the front: remove (e) terrazo and brick stairs to fix existing damaged. waterproof membrane and replace with grace waterproof membrane. repair any dry rotted spots on the plywood and landings. new stairs replace with split red bricks. no terrazzo back. | $3,500 |