Back to kitchen remodel contractors
Imbelloni Construction Co. Inc.
- Based in
- San Mateo
- On San Francisco permits
- Jan 2002 to Jun 2025
- Last 24 months
- 1 permit filed
77 permits since 2000: 70 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 13 completed. Typically 0 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 23, 2021 | Completed final sign-off Jun 2022 | 700 Steiner St | #302:kitchen cabinets removal/replacement. remove 400 sq ft plaster for electician in living, bathroom replace with 5/8" type x sheetrock. no removal of walls or new opening.Details
#302:kitchen cabinets removal/replacement. remove 400 sq ft plaster for electician in living, bathroom replace with 5/8" type x sheetrock. no removal of walls or new opening. | $40,000 |
| Nov 23, 2021 | Completed final sign-off Jun 2022 | 700 Steiner St | #701:kitchen and bathroom remodel. remove 600 sq ft plaster for electician in living, bathroom replace with 5/8" type x sheetrock. no removal of wall or new wall opening.Details
#701:kitchen and bathroom remodel. remove 600 sq ft plaster for electician in living, bathroom replace with 5/8" type x sheetrock. no removal of wall or new wall opening. | $30,000 |
| Aug 21, 2019 | Completed final sign-off Jan 2020 | 700 Steiner St | unit # 202: kitchen and bathroom remodel- kitchen 100 sq ft, bathroom 40 sq ft. remove 200 sq ft of plaster for electrical in living and bedroom. add one recirulatior fan and led lighting. replace with 5/8" type x sheetrock.Details
unit # 202: kitchen and bathroom remodel- kitchen 100 sq ft, bathroom 40 sq ft. remove 200 sq ft of plaster for electrical in living and bedroom. add one recirulatior fan and led lighting. replace with 5/8" type x sheetrock. | $45,000 |
| Aug 21, 2019 | Completed final sign-off Jan 2020 | 700 Steiner St | unit # 406: kitchen and bathroom remodel- kitchen 100 sq ft, bathroom 40 sq ft. remove 200 sq ft of plaster for electrical in living and bedroom. add one recirulatior fan and led lighting. replace with 5/8" type x sheetrock.Details
unit # 406: kitchen and bathroom remodel- kitchen 100 sq ft, bathroom 40 sq ft. remove 200 sq ft of plaster for electrical in living and bedroom. add one recirulatior fan and led lighting. replace with 5/8" type x sheetrock. | $30,000 |
| May 1, 2019 | Completed final sign-off Jul 2019 | 925 Sutter St | unit #101: remodel kitchen and bathroom. remove 100 sq ft of wall plaster for electrician and maintain fire rating- type x sheetrock.Details
unit #101: remodel kitchen and bathroom. remove 100 sq ft of wall plaster for electrician and maintain fire rating- type x sheetrock. | $30,000 |
| Mar 19, 2019 | Completed final sign-off Jun 2019 | 700 Steiner St | #506 to comply with nov 201917721, remodel kitchen in existing location/no alteration of walls new tile in bathroom, cabinets. new kitchen cabinets and counter. all new lighting shall be led. approximately 410 sqftDetails
#506 to comply with nov 201917721, remodel kitchen in existing location/no alteration of walls new tile in bathroom, cabinets. new kitchen cabinets and counter. all new lighting shall be led. approximately 410 sqft | $20,000 |
| Mar 19, 2019 | Completed final sign-off Jun 2019 | 700 Steiner St | #202 and #306 to comply with nov 201917721. #202 install hallway & bathroom vent, tub surround & shower valve. approx 140 sq ft. kitchen and bathroom. #306 kitchen remodel (kitchen cabinets, appliances) bathroom, recirculating systems in bath units. 140 sqft kitchen/bathDetails
#202 and #306 to comply with nov 201917721. #202 install hallway & bathroom vent, tub surround & shower valve. approx 140 sq ft. kitchen and bathroom. #306 kitchen remodel (kitchen cabinets, appliances) bathroom, recirculating systems in bath units. 140 sqft kitchen/bath | $30,000 |
| Mar 19, 2019 | Completed final sign-off Jun 2019 | 700 Steiner St | unit 505 and 605 to comply with nov 201917721. kitchen and bathroom remodel. installation of bathroom and recirculating fans. #505 100 sqft kitchen 40 sq ft bathroom. all new led lighting.Details
unit 505 and 605 to comply with nov 201917721. kitchen and bathroom remodel. installation of bathroom and recirculating fans. #505 100 sqft kitchen 40 sq ft bathroom. all new led lighting. | $50,000 |
| Mar 19, 2019 | Completed final sign-off Jun 2019 | 700 Steiner St | units 203, 204, 205 and 305. comply with nov 201917721. kitchen and bath remodel in all units. recirculating systems and bathroom fans in each unit. all new led lighting in each unit. each unit 140 sq feet for ktichen/bathDetails
units 203, 204, 205 and 305. comply with nov 201917721. kitchen and bath remodel in all units. recirculating systems and bathroom fans in each unit. all new led lighting in each unit. each unit 140 sq feet for ktichen/bath | $90,000 |
| Jan 10, 2019 | Completed final sign-off May 2019 | 700 Steiner St | unit 503: remodel kitchen and bathroom. remove 100 sqft wall for electrician, plaster onDetails
unit 503: remodel kitchen and bathroom. remove 100 sqft wall for electrician, plaster on | $20,000 |
| Jan 10, 2019 | Completed final sign-off Jul 2019 | 925 Sutter St | unit 502: remodel kitchen and bathroom. remove 100 sqft of wall for electrician, plaster onDetails
unit 502: remodel kitchen and bathroom. remove 100 sqft of wall for electrician, plaster on | $30,000 |
| Jan 10, 2019 | Completed final sign-off May 2019 | 700 Steiner St | unit 301: remodel kitchen and bathroom. remove 100 sqft wall for electrician, plaster onDetails
unit 301: remodel kitchen and bathroom. remove 100 sqft wall for electrician, plaster on | $20,000 |
| Apr 19, 2018 | Completed final sign-off Mar 2019 | 55 Polk St | comply w/ complaint his 201630481, bid 201857595. unit 104. kitchen remodel. replace sheetrock, install new cabinets & flooring, countertops. replace sheetrock w/ 5/8" type 'x.'Details
comply w/ complaint his 201630481, bid 201857595. unit 104. kitchen remodel. replace sheetrock, install new cabinets & flooring, countertops. replace sheetrock w/ 5/8" type 'x.' | $5,000 |