Back to bathroom remodel contractors
Ikb Stone Inc
- Based in
- South San Francisco
- On San Francisco permits
- Aug 2015 to Jun 2019
- Last 24 months
- 0 permits filed
47 permits since 2000: 34 completed, 8 never finaled, 5 expired or cancelled.
Of the 8 never-finaled permits, 6 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 20 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2019 | Completed final sign-off Feb 2020 | 114 Broderick St | remodel bathroom, add laundry closetDetails
remodel bathroom, add laundry closet | $15,000 |
| Mar 18, 2019 | Completed final sign-off Jun 2019 | 1380 Greenwich St | remodel bathroom: replace tub with shower stall. new tile sorrounding floor. upgrade electrical, replace plumbing fixtuer. no structural change upgrade in place.Details
remodel bathroom: replace tub with shower stall. new tile sorrounding floor. upgrade electrical, replace plumbing fixtuer. no structural change upgrade in place. | $11,000 |
| Feb 21, 2019 | Completed final sign-off Jul 2021 | 80 Harriet St | complete interior of the rear unit previously contructed under a different permit 200409013165. complete kitchen, bath, electrical and plumbing installations.Details
complete interior of the rear unit previously contructed under a different permit 200409013165. complete kitchen, bath, electrical and plumbing installations. | $10,000 |
| Jan 31, 2019 | Completed final sign-off Nov 2020 | 227 Waller St | remodel kitchen & bath; remove some interior walls & install steel beam. enlarge window openings & install wood windowsDetails
remodel kitchen & bath; remove some interior walls & install steel beam. enlarge window openings & install wood windows | $60,000 |
| Oct 31, 2018 | Completed final sign-off Apr 2019 | 2811 22nd St | modify non-structural partitions at 1st flr. renovate (e) bathroom, modify bedroom closetDetails
modify non-structural partitions at 1st flr. renovate (e) bathroom, modify bedroom closet | $40,000 |
| Oct 5, 2018 | Completed final sign-off May 2019 | 2811 22nd St | remodel 2 bathrooms in 2nd floor. replace fixtures, shower and tub surrounds, tile floor. no structural work. replace in kind. kitchen remodel in kind.Details
remodel 2 bathrooms in 2nd floor. replace fixtures, shower and tub surrounds, tile floor. no structural work. replace in kind. kitchen remodel in kind. | $50,000 |
| Oct 5, 2018 | Completed final sign-off Jan 2022 | 2318 44th Av | remodel bathroom, expand to lightwellDetails
remodel bathroom, expand to lightwell | $12,000 |
| Aug 3, 2018 | Completed final sign-off Jan 2019 | 120 Cresta Vista Dr | enlarge master bath. remodel guest bath. new fixtures, tile(toilets remaining). install drain in laundry room. new windows in bathrooms and laundry room.Details
enlarge master bath. remodel guest bath. new fixtures, tile(toilets remaining). install drain in laundry room. new windows in bathrooms and laundry room. | $18,000 |
| Jul 31, 2018 | Completed final sign-off May 2019 | 2978 Folsom St | construct new bathroom under stair on the 1st flr with new shower stall, toilet, vanity no exterior work.Details
construct new bathroom under stair on the 1st flr with new shower stall, toilet, vanity no exterior work. | $8,000 |
| Jun 1, 2018 | Expired or cancelled expired May 2022 | 380 Capistrano Av | remove non bearing wall perl plan. replace kitchen cabinets, counters, tile fl, removel bath, elec plumb to code, replace bath window in kind not visibleDetails
remove non bearing wall perl plan. replace kitchen cabinets, counters, tile fl, removel bath, elec plumb to code, replace bath window in kind not visible | $36,800 |
| Jan 8, 2018 | Completed final sign-off May 2018 | 1525 Shrader St | update 3 bathrooms in placenew bathroom hardware and toilets,; update lighting to high efficacy, install gfci, new tvb & shower surrounds, new vanity tops, cabinets to remain , new floor tiles; no structural changes, no new windows.Details
update 3 bathrooms in placenew bathroom hardware and toilets,; update lighting to high efficacy, install gfci, new tvb & shower surrounds, new vanity tops, cabinets to remain , new floor tiles; no structural changes, no new windows. | $19,000 |
| Oct 11, 2017 | Completed final sign-off Sep 2018 | 789 Buena Vista Ave West Av | #302:remodel kitchen and bath, move location of toilet and vanity, remove wall between kitchen and hall, enlarge door opening to living room in kitchen, install new cabinets, plumbing fixtures and counters, update electrical (lighting), replace 2 windows in kind, not visable from street.Details
#302:remodel kitchen and bath, move location of toilet and vanity, remove wall between kitchen and hall, enlarge door opening to living room in kitchen, install new cabinets, plumbing fixtures and counters, update electrical (lighting), replace 2 windows in kind, not visable from street. | $27,000 |
| Oct 11, 2017 | Never finaled issued Oct 2017, no final | 880 Haight St | add bathroom with prefab shower pan, run cold & hot watere lines, discharge water line, run new vent at the building side.Details
add bathroom with prefab shower pan, run cold & hot watere lines, discharge water line, run new vent at the building side. | $22,000 |
| Aug 31, 2017 | Completed final sign-off Oct 2017 | 991 Capitol Av | comply w/nov #201565961 - remodel bathroom: replace fixtures vanity, tub surround, new tub, tile floor. no changes to layout.Details
comply w/nov #201565961 - remodel bathroom: replace fixtures vanity, tub surround, new tub, tile floor. no changes to layout. | $9,000 |
| May 23, 2017 | Completed final sign-off Oct 2017 | 2872 Jackson St | remodel bathroom and replace water closet with 1/2 bath.Details
remodel bathroom and replace water closet with 1/2 bath. | $15,000 |
| May 12, 2017 | Completed final sign-off Jun 2018 | 74 Lundys Ln | remodel basement: convert laundry room to full bath, replace 2 windows in basement living area (not visible from st), replace door to the yard, add closet space to living area.Details
remodel basement: convert laundry room to full bath, replace 2 windows in basement living area (not visible from st), replace door to the yard, add closet space to living area. | $17,000 |
| Mar 14, 2017 | Completed final sign-off Sep 2017 | 1590 22nd Av | remodel bath: replace tub and fixtures, install led lighting. install additional sub panel, refinish floors, repaint.Details
remodel bath: replace tub and fixtures, install led lighting. install additional sub panel, refinish floors, repaint. | $17,000 |
| Jan 9, 2017 | Never finaled issued Jan 2017, no final | 789 Buena Vista Ave West Av | #302 - enlarge existing bathroom by expanding into adjacent hall and closet. new shower stall and replace pedestal sink, install new toilet, replace window in-kind, not visible from street or public space update electrical and plumbingDetails
#302 - enlarge existing bathroom by expanding into adjacent hall and closet. new shower stall and replace pedestal sink, install new toilet, replace window in-kind, not visible from street or public space update electrical and plumbing | $11,000 |
| Jan 9, 2017 | Completed final sign-off Apr 2017 | 2577 23rd Av | bathroom remodel - replace tub, vanity, floor tile, tub surround, move non-bearing wall approximately 12 inches; install new toilet, install new conforming wiring, move door approx. 6". install floor heating (electrical)Details
bathroom remodel - replace tub, vanity, floor tile, tub surround, move non-bearing wall approximately 12 inches; install new toilet, install new conforming wiring, move door approx. 6". install floor heating (electrical) | $12,000 |
| Nov 15, 2016 | Completed final sign-off Feb 2017 | 1233 27th Av | bathroom remodel in place no structural changes replace tub, surround, tile floor replace vanity, install led lights, install floor heater install new in wall toiletDetails
bathroom remodel in place no structural changes replace tub, surround, tile floor replace vanity, install led lights, install floor heater install new in wall toilet | $12,000 |
| Sep 26, 2016 | Completed final sign-off Sep 2016 | 744 Church St | bathroom: install new vanity, sink and faucet, repace (e) gfci and switch and lighting fixtureDetails
bathroom: install new vanity, sink and faucet, repace (e) gfci and switch and lighting fixture | $2,000 |
| Mar 17, 2016 | Completed final sign-off Jul 2016 | 1325 Indiana St | remodel bath, replace exhaust fan, floor tile, install new shower pan & enclosure, new vanity & sink. replace in-kind in unit#22 only. all new lites shall be led. n/a for maher.Details
remodel bath, replace exhaust fan, floor tile, install new shower pan & enclosure, new vanity & sink. replace in-kind in unit#22 only. all new lites shall be led. n/a for maher. | $13,720 |
| Sep 11, 2015 | Completed final sign-off Apr 2016 | 37 Midway St | #2 - remodel 2 baths: guest bath: remove tile, replace sheetrock, install new shower pan & surround, replace fixtures. master bath: remove tile & replace with drywall, replace fixtures, replace shower pan & surround. n/a maher ordinanceDetails
#2 - remodel 2 baths: guest bath: remove tile, replace sheetrock, install new shower pan & surround, replace fixtures. master bath: remove tile & replace with drywall, replace fixtures, replace shower pan & surround. n/a maher ordinance | $15,000 |