Permit GraphShortlistSan Francisco building permits since 2000

Ibuilders Design And Build Inc

Contractor license
1077269
State license record
Based in
Sunnyvale
On San Francisco permits
Aug 2023 to Aug 2024
Last 24 months
0 permits filed

5 permits since 2000: 2 completed, 2 in progress, 1 never finaled.

Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllRoof deck 1Deck 1Stairs 1Kitchen remodel 1Bathroom remodel 1

1 bathroom remodel permit: 1 completed. Typically 8 days from filing to permit and 169 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 8, 2023Completed
final sign-off Feb 2024
774 Potrero Avrev to pa# 2021-0607-1758: remodel kitchen same location with miner structual 150 sf bathroom remodel same location, new drywall, new heathing and min split, new tankless at same location, new plumbing line, new electrical through out
Details
Permit
202308083964
Status
complete
Filed
Aug 8, 2023
Permit issued
Aug 16, 2023
Final sign-off
Feb 1, 2024
Address
774 Potrero Av

rev to pa# 2021-0607-1758: remodel kitchen same location with miner structual 150 sf bathroom remodel same location, new drywall, new heathing and min split, new tankless at same location, new plumbing line, new electrical through out

Open the permit page