Ibuilders Design And Build Inc
- Based in
- Sunnyvale
- On San Francisco permits
- Aug 2023 to Aug 2024
- Last 24 months
- 0 permits filed
5 permits since 2000: 2 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2024 | Completed final sign-off Sep 2024 | 2476 Diamond St | to comply w/ notice of violation #202317377. remove sub soil drainage piping installed without permitDetails
to comply w/ notice of violation #202317377. remove sub soil drainage piping installed without permit | |
| Mar 26, 2024 | In progress filed Mar 2024, not yet issued | 2476 Diamond St | install new hatch access point at roof top deck area. 460 sq ft new glass railing around the rooftop. interior remodel for new staircase access 90 sq ft of remodel areaDetails
install new hatch access point at roof top deck area. 460 sq ft new glass railing around the rooftop. interior remodel for new staircase access 90 sq ft of remodel area | $100,000 |
| Jan 12, 2024 | In progress filed Jan 2024, not yet issued | 774 Potrero Av | rev to pa# 2023-0808-3964; remove special inspection for hers test only mini split (no a-vac)Details
rev to pa# 2023-0808-3964; remove special inspection for hers test only mini split (no a-vac) | |
| Sep 19, 2023 | Never finaled filed Sep 2023, never issued | 2476 Diamond St | build a new deck to comply w/ complaint 202312629 @ rear. deck no attached to building, 3 6700heightDetails
build a new deck to comply w/ complaint 202312629 @ rear. deck no attached to building, 3 6700height | $30,000 |
| Aug 8, 2023 | Completed final sign-off Feb 2024 | 774 Potrero Av | rev to pa# 2021-0607-1758: remodel kitchen same location with miner structual 150 sf bathroom remodel same location, new drywall, new heathing and min split, new tankless at same location, new plumbing line, new electrical through outDetails
rev to pa# 2021-0607-1758: remodel kitchen same location with miner structual 150 sf bathroom remodel same location, new drywall, new heathing and min split, new tankless at same location, new plumbing line, new electrical through out |