Back to kitchen remodel contractors
Ian P Lawes & Associates
- Based in
- Los Angeles
- On San Francisco permits
- Jan 2025 to Jun 2026
- Last 24 months
- 5 permits filed
5 permits since 2000: 2 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 1 completed, 2 in progress. Typically 20 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2026 | In progress issued Apr 2026 | 524 Valencia St | interior demolition of select floor and wall finishes in the ground floor dining room, no work/demo to exterior of the building. mezzanine dining area, ground floor bar/kitchen restroom areas or basement kitchen. accessibility requirements for this bpa deferred to bpa 2026/0427/0171, (t.i. permit).Details
interior demolition of select floor and wall finishes in the ground floor dining room, no work/demo to exterior of the building. mezzanine dining area, ground floor bar/kitchen restroom areas or basement kitchen. accessibility requirements for this bpa deferred to bpa 2026/0427/0171, (t.i. permit). | $2,000 |
| Apr 27, 2026 | In progress filed Apr 2026, not yet issued | 524 Valencia St | tenant improvement to existing ground floor restaurant scope limited to bar and kitchen spaces, and accessibility upgrades.Details
tenant improvement to existing ground floor restaurant scope limited to bar and kitchen spaces, and accessibility upgrades. | $75,000 |
| Jan 24, 2025 | Completed final sign-off Jul 2025 | 1001 South Van Ness Av | non-structural remodel (e) ground floor restaurant, construct new non load bearing partitions, kitchen equipment, exhause hood, lighting, finishes, related mep.Details
non-structural remodel (e) ground floor restaurant, construct new non load bearing partitions, kitchen equipment, exhause hood, lighting, finishes, related mep. | $200,000 |