Back to kitchen remodel contractors
I E Design & Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Jun 2011 to Apr 2014
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 4 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2013 | Completed final sign-off Nov 2013 | 409 Crestmont Dr | bathroom and kitchen remodel; repair/replace dry rot for rear deck (less than 50% being replaced). work in unit 409 only.Details
bathroom and kitchen remodel; repair/replace dry rot for rear deck (less than 50% being replaced). work in unit 409 only. | $15,000 |
| Mar 28, 2013 | Completed final sign-off Oct 2013 | 2655 44th Av | legalize 2 bedrooms,3 full baths, one half bath and one storage room at 1st floor. removed illegal kitchen at 1st floor. remove sub floor to increase ceiling height to min 7'-6"Details
legalize 2 bedrooms,3 full baths, one half bath and one storage room at 1st floor. removed illegal kitchen at 1st floor. remove sub floor to increase ceiling height to min 7'-6" | $20,000 |
| Feb 25, 2013 | Completed final sign-off Apr 2013 | 367 Head St | comply with nov 200734213. remove illegal kitchen at 1st floor. remove sub-floor to increase ceiling height to min 7'-6'Details
comply with nov 200734213. remove illegal kitchen at 1st floor. remove sub-floor to increase ceiling height to min 7'-6' | $4,000 |
| Jul 16, 2012 | Completed final sign-off Sep 2012 | 60 Dearborn St | unit #8-enlarge living room, remodel kitchen and reduce down bedroom. no structural changes. all walls to be removed are partition walls onlyDetails
unit #8-enlarge living room, remodel kitchen and reduce down bedroom. no structural changes. all walls to be removed are partition walls only | $15,000 |
| Jul 16, 2012 | Completed final sign-off Feb 2013 | 1812 Santiago St | 1st floor-add 3 bedrooms & 3 bathrooms on garage level, 2nd floor-remodel (e) kitchen & add 1 full bathroomDetails
1st floor-add 3 bedrooms & 3 bathrooms on garage level, 2nd floor-remodel (e) kitchen & add 1 full bathroom | $80,000 |
| Apr 5, 2012 | Completed final sign-off Dec 2012 | 1587 31st Av | remodel kitchen and bath (2), convert half bath to laundry room at 2nd flDetails
remodel kitchen and bath (2), convert half bath to laundry room at 2nd fl | $15,000 |
| Mar 12, 2012 | Completed final sign-off Apr 2013 | 1222 11th Av | remodel e bath and replace e shower. replace e counter top, cabinets, new cabinets, new cabinets and counter top in e kitchen. all on 2nd flDetails
remodel e bath and replace e shower. replace e counter top, cabinets, new cabinets, new cabinets and counter top in e kitchen. all on 2nd fl | $5,000 |