Back to bathroom remodel contractors
Hymac Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2016 to Dec 2019
- Last 24 months
- 0 permits filed
15 permits since 2000: 8 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 2 completed, 4 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 546 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2019 | Never finaled issued Feb 2020, no final | 1045 14th St | unit #1045a 1st floor: remodel/relocate existing bathroom and kitchen. at basement, modify existing floor space to 2 new bedrooms, new family, 2 new bathrooms, and new interior stair for unit #1045a.Details
unit #1045a 1st floor: remodel/relocate existing bathroom and kitchen. at basement, modify existing floor space to 2 new bedrooms, new family, 2 new bathrooms, and new interior stair for unit #1045a. | $120,000 |
| Jul 31, 2019 | Never finaled issued Jul 2019, no final | 1603 Treat Av | remodel kitchen, 150 sf, bath remodel, 50 sf, new elec, new plumbing, insulation, sheetrock, replace in kindDetails
remodel kitchen, 150 sf, bath remodel, 50 sf, new elec, new plumbing, insulation, sheetrock, replace in kind | $42,000 |
| Jul 26, 2019 | Never finaled issued Jul 2019, no final | 3549 Mission St | units 1&2: remodel (2) kitchens (180 sq. ft. each), remodel (4) bathrooms (40 sq. ft. each), new sheetrock/electrical/plumbing, new insulation, dry rot repair smal area rear door, replace (8) windows not visible from streetDetails
units 1&2: remodel (2) kitchens (180 sq. ft. each), remodel (4) bathrooms (40 sq. ft. each), new sheetrock/electrical/plumbing, new insulation, dry rot repair smal area rear door, replace (8) windows not visible from street | $42,800 |
| Nov 29, 2018 | Never finaled issued Nov 2018, no final | 1603 Treat Av | exploratory demo, inspect plumbing/electrical, lath & plaster removal, bathroom demo, expose foundation, excavate inspection holesDetails
exploratory demo, inspect plumbing/electrical, lath & plaster removal, bathroom demo, expose foundation, excavate inspection holes | $1,000 |
| Oct 24, 2016 | Completed final sign-off Dec 2017 | 1219 Broderick St | ground floor remodeling - add master bedroom & bathroom, add (2) new bathrooms, legalize (e) bedroom, family room & media room. n/a maher ordinanceDetails
ground floor remodeling - add master bedroom & bathroom, add (2) new bathrooms, legalize (e) bedroom, family room & media room. n/a maher ordinance | $65,000 |
| Oct 7, 2016 | Expired or cancelled expired Nov 2021 | 707 Rockdale Dr | remodel of single family dwelling to create accessible access for paraplegic child. new ellvator, vertical addition to add bedrooms & bath. excavate at first floor to create legal habitable space. new ramp at front yard to allow 13.8cubic yard of dirt removed.Details
remodel of single family dwelling to create accessible access for paraplegic child. new ellvator, vertical addition to add bedrooms & bath. excavate at first floor to create legal habitable space. new ramp at front yard to allow 13.8cubic yard of dirt removed. | $300,000 |
| Jul 22, 2016 | Completed final sign-off Jul 2018 | 1219 Broderick St | interior remodeling: remodel 2nd floor kitchen & bath. n/a maher ordinanceDetails
interior remodeling: remodel 2nd floor kitchen & bath. n/a maher ordinance | $50,000 |