Hyline Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Sep 2023
- Last 24 months
- 0 permits filed
32 permits since 2000: 28 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 57 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2022 | Completed final sign-off May 2022 | 61 Chattanooga St | existing brick guardrail and foundation at main entry stair to be rebuilt in kind-due to structural failure.Details
existing brick guardrail and foundation at main entry stair to be rebuilt in kind-due to structural failure. | $12,000 |
| May 1, 2015 | Completed final sign-off Oct 2015 | 1825 Scott St | revision to 2013 0513 6729; kitchen and room layout at lower level revised interior stair removed, some window sizes changedDetails
revision to 2013 0513 6729; kitchen and room layout at lower level revised interior stair removed, some window sizes changed | |
| Jan 8, 2015 | Completed final sign-off Jun 2015 | 1865 Greenwich St | revision to pa# 2012-0202-3456 and pa# 2014-0911-6092. addition of roof deck, accessed by stair from fourth floor and roof hatch.Details
revision to pa# 2012-0202-3456 and pa# 2014-0911-6092. addition of roof deck, accessed by stair from fourth floor and roof hatch. | $8,000 |