Back to kitchen remodel contractors
Hyan Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2007 to Jun 2026
- Last 24 months
- 4 permits filed
37 permits since 2000: 32 completed, 3 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 12 completed, 2 in progress. Typically 4 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Jul 2026 | 2 Westgate Dr | 1/f: new bathroom, media room, wetbar, and laundry. remodel bathroom. 2/f: remodel kitchen in-kind.Details
1/f: new bathroom, media room, wetbar, and laundry. remodel bathroom. 2/f: remodel kitchen in-kind. | $110,000 |
| Feb 25, 2026 | In progress issued Feb 2026 | 819 Garfield St | kitchen remodel in kind, replace 600 sq ft of flooring 2nd flr. no structual work.Details
kitchen remodel in kind, replace 600 sq ft of flooring 2nd flr. no structual work. | $10,000 |
| Jun 18, 2024 | Completed final sign-off Apr 2025 | 245 Goettingen St | 1. add (n) bedroom and 1 kitchenette at 1st floor. remodel (e) bathroom at 1st floor. (no oven)Details
1. add (n) bedroom and 1 kitchenette at 1st floor. remodel (e) bathroom at 1st floor. (no oven) | $60,000 |
| Oct 28, 2019 | Completed final sign-off Jun 2021 | 2422 44th Av | bathroom remodel - add ventilation fan, re-do tile, replace fixtures); kitchen remodel - re-do tile, flooring and replace cabinets and sinkDetails
bathroom remodel - add ventilation fan, re-do tile, replace fixtures); kitchen remodel - re-do tile, flooring and replace cabinets and sink | $20,000 |
| Nov 6, 2017 | Completed final sign-off Apr 2018 | 189 Warren Dr | comply w/nov #201715051 & 201714694: remodel (e) bathroom & laundry room at ground floor. remodel (e) kitchen, bathoom, remove partial partition wall & install staircase down to ground floor at rear. remodel two bathroom & convert (e) sitting room to master bedroom at 3rd floor.Details
comply w/nov #201715051 & 201714694: remodel (e) bathroom & laundry room at ground floor. remodel (e) kitchen, bathoom, remove partial partition wall & install staircase down to ground floor at rear. remodel two bathroom & convert (e) sitting room to master bedroom at 3rd floor. | $78,000 |
| Dec 16, 2016 | Completed final sign-off Jun 2018 | 2201 Balboa St | for units 2/3/4/5: each unit: replace kitchen cabinets, appliances, sink & install gfci outlets. no structural work. install new gfci outlets on unit 1. all layouts to remain unchanged.Details
for units 2/3/4/5: each unit: replace kitchen cabinets, appliances, sink & install gfci outlets. no structural work. install new gfci outlets on unit 1. all layouts to remain unchanged. | $20,000 |
| May 25, 2016 | Completed final sign-off Nov 2016 | 3892 19th St | kitchen remodel, add powder room, replace 2 windowsDetails
kitchen remodel, add powder room, replace 2 windows | $120,000 |
| Sep 2, 2015 | Completed final sign-off Mar 2016 | 2935 Pacheco St | remodel kitchen and one bathroom at main floorDetails
remodel kitchen and one bathroom at main floor | $5,000 |
| Jul 9, 2015 | Completed final sign-off Oct 2015 | 170 Graystone Tr | unit #1: to comply with complaint #201555361. remove non-bearing wall at kitchen at unit 1 only. remodel bathroom on unit # 1 only.Details
unit #1: to comply with complaint #201555361. remove non-bearing wall at kitchen at unit 1 only. remodel bathroom on unit # 1 only. | $12,000 |
| Sep 12, 2011 | Completed final sign-off Oct 2011 | 1277 Cayuga Av | remodel kitchen & bathroom in the main floor, kitchen lighting: min 50% high efficiacy, cec 150 (k) 8, bathroom lighting: high efficacy or provide manual on occupancy sensors.Details
remodel kitchen & bathroom in the main floor, kitchen lighting: min 50% high efficiacy, cec 150 (k) 8, bathroom lighting: high efficacy or provide manual on occupancy sensors. | $8,000 |
| Apr 12, 2010 | Completed final sign-off Aug 2010 | 716 Cole St | kitchen & bathroom remodel, replace counter tops, cabinets, bath tubs, sinks, fixtures on both units.Details
kitchen & bathroom remodel, replace counter tops, cabinets, bath tubs, sinks, fixtures on both units. | $15,000 |
| Sep 19, 2007 | Completed final sign-off Mar 2008 | 2933 Yorba St | remodel first and second floors- 2nd floor remodel kitchen and 2 new bathrooms to replace existing 1. 1st floor one new bathroom and laundry room. a new exterior rear exit and 4 new windows.Details
remodel first and second floors- 2nd floor remodel kitchen and 2 new bathrooms to replace existing 1. 1st floor one new bathroom and laundry room. a new exterior rear exit and 4 new windows. | $70,000 |
| Sep 13, 2007 | Completed final sign-off Apr 2008 | 1848 24th Av | 1st floor-remodeling of unimprove area in garage and bedroom to have family room, 2 baths, bedroom, study and office. on the 2nd floor, remodel ex. kitchen and bathroom. add bathroom. work include excavation of 1st floor to increase ceiling height to 8'-0"Details
1st floor-remodeling of unimprove area in garage and bedroom to have family room, 2 baths, bedroom, study and office. on the 2nd floor, remodel ex. kitchen and bathroom. add bathroom. work include excavation of 1st floor to increase ceiling height to 8'-0" | $100,000 |
| Feb 14, 2007 | Completed final sign-off Nov 2008 | 1443 08th Av | new two story addition on rear of building. interior remodel of upper floor including kitchen and baths.Details
new two story addition on rear of building. interior remodel of upper floor including kitchen and baths. | $250,000 |