Hvp General Contractor
- Based in
- San Leandro
- On San Francisco permits
- Jul 2009 to Jan 2018
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 16, 2018 | Completed final sign-off Apr 2018 | 388 Cresta Vista Dr | remodel 2 bathrooms and closet.Details
remodel 2 bathrooms and closet. | $15,000 |
| Jul 10, 2017 | Completed final sign-off Nov 2017 | 37 High St | 2nd flr rear unit remodel kitchen, bathroom,replacement of entry door, bathroom& bedroom doors, and sliding door at kitchen. install 18 led 4in recessed lights, 2 incon light. replace of new subpanel and rewire througout. install sound proof insulation at ceiling.Details
2nd flr rear unit remodel kitchen, bathroom,replacement of entry door, bathroom& bedroom doors, and sliding door at kitchen. install 18 led 4in recessed lights, 2 incon light. replace of new subpanel and rewire througout. install sound proof insulation at ceiling. | $25,000 |
| Jul 10, 2017 | Expired or cancelled expired Aug 2025 | 39 High St | 2nd flr front remodel kitchen, bathroom,replacement of entry door, bathroom& bedroom doors, and sliding door at kitchen. install 30 led 4in recessed lights, 3 incon light, frame new fireplce enclosure and walls. replace of new subpanel and rewire througout. install sound proof insulation at ceiling.Details
2nd flr front remodel kitchen, bathroom,replacement of entry door, bathroom& bedroom doors, and sliding door at kitchen. install 30 led 4in recessed lights, 3 incon light, frame new fireplce enclosure and walls. replace of new subpanel and rewire througout. install sound proof insulation at ceiling. | $30,000 |
| Sep 28, 2016 | Completed final sign-off Mar 2017 | 1622 33rd Av | change new contractor to perform the extg permit. revise plan of master bath. switch the master bathroom and closet. scope of work to remain. revision to app #2016-07-18-2626.Details
change new contractor to perform the extg permit. revise plan of master bath. switch the master bathroom and closet. scope of work to remain. revision to app #2016-07-18-2626. | |
| Jul 18, 2016 | Never finaled issued Jul 2016, no final | 1622 33rd Av | convert (e) wash & dry into full bathroom. existing first floor bathroom into (e) bedroom. expand existing 2nd floor toilet. infill (e) lightwell on second floor.Details
convert (e) wash & dry into full bathroom. existing first floor bathroom into (e) bedroom. expand existing 2nd floor toilet. infill (e) lightwell on second floor. | $40,000 |
| May 28, 2015 | Completed final sign-off Jun 2015 | 4660 25th St | rev. to pa#201503261952 existing window to be replaced with new door, existing window to be remain with no change.Details
rev. to pa#201503261952 existing window to be replaced with new door, existing window to be remain with no change. | |
| Apr 2, 2015 | Completed final sign-off Apr 2015 | 1688 Sacramento St | revision to pa# 2015 0323 1611: move toilet 1/2"-1" towards side wall. move grab bar forward in one of the bathrooms to allow a 24" distance from front of the toilet to end of grab bar. cut a 30" section of & (e) bar-counter to make space for ada reqs.Details
revision to pa# 2015 0323 1611: move toilet 1/2"-1" towards side wall. move grab bar forward in one of the bathrooms to allow a 24" distance from front of the toilet to end of grab bar. cut a 30" section of & (e) bar-counter to make space for ada reqs. | |
| Mar 26, 2015 | Completed final sign-off Jun 2015 | 4660 25th St | add new bathroom at main floor and add new door access to back yard.Details
add new bathroom at main floor and add new door access to back yard. | $10,000 |
| Mar 26, 2015 | Completed final sign-off Jun 2015 | 286 Green St | repair existing roof structure at backyard. install 8 new 6 inches recessed lights and 9 recessed lights in kitchen.Details
repair existing roof structure at backyard. install 8 new 6 inches recessed lights and 9 recessed lights in kitchen. | $10,000 |
| Mar 24, 2015 | Never finaled issued Mar 2015, no final | 1688 Sacramento St | install illum. letters to (e) awning (remove (e) letters)Details
install illum. letters to (e) awning (remove (e) letters) | $2,000 |
| Mar 23, 2015 | Completed final sign-off Apr 2015 | 1688 Sacramento St | replace tile bar service area. cosmetic resurfacing of bar front, replace sheetrock bar area. cosmetic decoration wrapping around exisitng columns.Details
replace tile bar service area. cosmetic resurfacing of bar front, replace sheetrock bar area. cosmetic decoration wrapping around exisitng columns. | $2,500 |
| Apr 21, 2014 | Completed final sign-off Aug 2014 | 37 High St | to comply with physical inspection report #cc-7421Details
to comply with physical inspection report #cc-7421 | $2,000 |
| Jul 31, 2013 | Completed final sign-off Sep 2013 | 36 Cortland Av | to comply with nov #201102365 to correct gutter drain system. to comply w/the complaint #201387681 - #5, #6 (building permit), #7, #8,#9 (plumging permit).Details
to comply with nov #201102365 to correct gutter drain system. to comply w/the complaint #201387681 - #5, #6 (building permit), #7, #8,#9 (plumging permit). | $8,000 |
| Jan 8, 2013 | Completed final sign-off Aug 2014 | 37 High St | convert basement to living legal entertainment/bonus room, (n) 1/2 bathroom, (n) deck and 50 amp sub panel, replace bottom deck, new living space to be sprinklered under seperate permit.Details
convert basement to living legal entertainment/bonus room, (n) 1/2 bathroom, (n) deck and 50 amp sub panel, replace bottom deck, new living space to be sprinklered under seperate permit. | $25,000 |
| Jun 14, 2011 | Completed final sign-off Dec 2011 | 37 High St | kitchen remodel, gas line, new windows. at least 50% high efficacy lighting (by wattage), window u-factor 0.40 max. window not facing the streetDetails
kitchen remodel, gas line, new windows. at least 50% high efficacy lighting (by wattage), window u-factor 0.40 max. window not facing the street | $8,000 |
| Jul 8, 2009 | Completed final sign-off Nov 2009 | 10 Quickstep Ln | unit # 1 -remodel 2 bathrooms, remodel 1 kitchens no structural work in kind-Details
unit # 1 -remodel 2 bathrooms, remodel 1 kitchens no structural work in kind- | $15,000 |