Block 5674, lot 015A
36 Cortland Ave
- City’s use
- Single Family Residential
- Built
- 1910
- Stories
- 3
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,689 sq ft
- Lot
- 1,245 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 11, 2016 | Never finaled issued Mar 2016, no final | 36 Cortland Av | revision to ref pa 2015 1008 9189: install fireplace, route gas and ele to new fireplace. f/p is sealed, direct vent non-wood burning. route vent to roof. maher naDetails
revision to ref pa 2015 1008 9189: install fireplace, route gas and ele to new fireplace. f/p is sealed, direct vent non-wood burning. route vent to roof. maher na | $3,000 | |
| Mar 3, 2016 | Never finaled issued Mar 2016, no final | 36 Cortland Av | Schmitt Heating Co Inc | replace existing ductwork in garage with new steel ductwork. n/a maher ord. 155-13Details
replace existing ductwork in garage with new steel ductwork. n/a maher ord. 155-13 | $7,765 |
| Feb 29, 2016 | Completed final sign-off Mar 2016 | 36 Cortland Av | Roofing Logistics | reroofingDetails
reroofing | $16,900 |
| Oct 8, 2015 | Never finaled issued Jan 2016, no final | 36 Cortland Av | revision to pa 2014 0714 1177 widen dormer, alter 2nd storey stairs, strengthen 3rd floor and roof. add ridge beam to rear roof. maher naDetails
revision to pa 2014 0714 1177 widen dormer, alter 2nd storey stairs, strengthen 3rd floor and roof. add ridge beam to rear roof. maher na | ||
| Jul 14, 2014 | Completed final sign-off Jan 2017 | 36 Cortland Av | interior remodel of 2nd & 3rd floor. remove 2 story rear section & add 1 story deck.add dormers (n) skylights and (n) glazing windows and doors. ** maher: compliance with ordinance no# 155-13 not required **Details
interior remodel of 2nd & 3rd floor. remove 2 story rear section & add 1 story deck.add dormers (n) skylights and (n) glazing windows and doors. ** maher: compliance with ordinance no# 155-13 not required ** | $100,000 | |
| Jul 31, 2013 | Completed final sign-off Sep 2013 | 36 Cortland Av | Hvp General Contractor | to comply with nov #201102365 to correct gutter drain system. to comply w/the complaint #201387681 - #5, #6 (building permit), #7, #8,#9 (plumging permit).Details
to comply with nov #201102365 to correct gutter drain system. to comply w/the complaint #201387681 - #5, #6 (building permit), #7, #8,#9 (plumging permit). | $8,000 |
| Feb 18, 2011 | Completed final sign-off Apr 2011 | 36 Cortland Av | removal of all illegal construction in garage to comply with nov #200885900Details
removal of all illegal construction in garage to comply with nov #200885900 | $3,500 | |
| Oct 15, 2002 | Never finaled issued Oct 2002, no final | 36 Cortland Av | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hvp General Contractor, Roofing Logistics, Schmitt Heating Co Inc
- Engineers
- Giuseppe Sircana (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.