Hutan Construction
- Based in
- Oakland
- On San Francisco permits
- Mar 2018 to Nov 2022
- Last 24 months
- 0 permits filed
17 permits since 2000: 15 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 37 days from filing to permit and 446 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2022 | Completed final sign-off Dec 2022 | 2968 23rd St | 1/f: new bedroom #b, bath, family rm, wet-bar, laundry rm and stair. new barn door, new low deck. 2/f: remodel existing bedroom to master room with new master bath. remodel existing kitchen and bathroom. infill lightwell, new stair. demo rear shedDetails
1/f: new bedroom #b, bath, family rm, wet-bar, laundry rm and stair. new barn door, new low deck. 2/f: remodel existing bedroom to master room with new master bath. remodel existing kitchen and bathroom. infill lightwell, new stair. demo rear shed | $100,000 |
| Jun 16, 2021 | Completed final sign-off May 2025 | 316 Laurel St | bsmt - add 1 office, 1 bedrm, 1 (3) fixture bathrm, 1 powdrm, laundry w/sink, 1 entertainment rm; elevator replace in-kind; 1st fl - reconfig int layout. include foyer, livingrm, library, kitchen, dining, wet bar & fam rm. alter front entrance & stair. replace skylight @ fam rm; 2nd fl - reconfigDetails
bsmt - add 1 office, 1 bedrm, 1 (3) fixture bathrm, 1 powdrm, laundry w/sink, 1 entertainment rm; elevator replace in-kind; 1st fl - reconfig int layout. include foyer, livingrm, library, kitchen, dining, wet bar & fam rm. alter front entrance & stair. replace skylight @ fam rm; 2nd fl - reconfig | $100,000 |
| Jun 3, 2021 | Completed final sign-off Oct 2022 | 74 Levant St | in kind kitchen remodel. in kind two bathroom remodel. repairing deck and stairs dry rot at rear. under 50 % repair balconey at 2nd floor and dry rotDetails
in kind kitchen remodel. in kind two bathroom remodel. repairing deck and stairs dry rot at rear. under 50 % repair balconey at 2nd floor and dry rot | $35,000 |
| Dec 30, 2020 | Completed final sign-off Nov 2022 | 1355 Monterey Bl | convert 353 s.f of existing garage to living space. rebuild interior stair to basement, interior remodel of kitchen, powder room, laundry and bathrooms. replce existing windows in kind.Details
convert 353 s.f of existing garage to living space. rebuild interior stair to basement, interior remodel of kitchen, powder room, laundry and bathrooms. replce existing windows in kind. | $120,000 |