Back to kitchen remodel contractors
Hunts Construction Partnership
- Based in
- Modesto
- On San Francisco permits
- Apr 2014 to Jan 2025
- Last 24 months
- 1 permit filed
18 permits since 2000: 16 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 expired or cancelled. Typically 84 days from filing to permit and 443 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 13, 2023 | Completed final sign-off Feb 2025 | 261 Church St | relocate kitchen & bathroom. new office at rear of buildingDetails
relocate kitchen & bathroom. new office at rear of building | $60,000 |
| Dec 6, 2018 | Expired or cancelled expired Jun 2026 | 818 Green St | 1st fl:add bdr, 1 full bath and fam room, add interior stairs to connect 2nd fl. unit 818: remodel kithcen and bath rm, add 1 full and 1 bdr, unit 818a: remodel kitchen and bath rm, add 1 full bath, unit 820: remodel kitchen and bath rm, add 1 full bath. sprinkler unit #818 with nfda under sep paDetails
1st fl:add bdr, 1 full bath and fam room, add interior stairs to connect 2nd fl. unit 818: remodel kithcen and bath rm, add 1 full and 1 bdr, unit 818a: remodel kitchen and bath rm, add 1 full bath, unit 820: remodel kitchen and bath rm, add 1 full bath. sprinkler unit #818 with nfda under sep pa | $90,000 |
| May 1, 2018 | Completed final sign-off May 2019 | 539 16th Av | remove (e) exterior stairs. remodel kitche, remove dining (kitchen wall) add exterior deck and stairsDetails
remove (e) exterior stairs. remodel kitche, remove dining (kitchen wall) add exterior deck and stairs | $40,000 |
| Aug 18, 2017 | Completed final sign-off May 2019 | 841 47th Av | 1/f: add 2 bedrooms, 2 full baths, family room and laundry room. 2/f: remodel kitchen, bathroom and reconfigure interior stairs. 3/f: remodel bath, add new roof deck.Details
1/f: add 2 bedrooms, 2 full baths, family room and laundry room. 2/f: remodel kitchen, bathroom and reconfigure interior stairs. 3/f: remodel bath, add new roof deck. | $110,000 |
| Apr 5, 2016 | Completed final sign-off Mar 2017 | 1740 Palou Av | remodel (2) kitchens and (2) bathrooms at 1st and 2nd fl. new lighting per planDetails
remodel (2) kitchens and (2) bathrooms at 1st and 2nd fl. new lighting per plan | $30,000 |
| Apr 30, 2014 | Completed final sign-off Mar 2018 | 6423 California St | (e) 2nd floor residential unit over 1st floor vacant commercial space. convert 1st floor commercial space into new residential unit within rh-2 zoning (no change of building envelope). 1 kitchen, 1 living room, 2 bedrooms, 3.5 baths, 1 family room.Details
(e) 2nd floor residential unit over 1st floor vacant commercial space. convert 1st floor commercial space into new residential unit within rh-2 zoning (no change of building envelope). 1 kitchen, 1 living room, 2 bedrooms, 3.5 baths, 1 family room. | $115,000 |