Hunny Do Fixit
- Based in
- San Bruno
- On San Francisco permits
- Jun 2002 to Oct 2012
- Last 24 months
- 0 permits filed
9 permits since 2000: 2 completed, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 1 completed, 3 never finaled. Typically 69 days from filing to permit and 1893 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 23, 2011 | Never finaled issued Dec 2011, no final | 41 Barcelona Av | revision to permit 200906231101. install previously extg sky light above stair #3 to code.Details
revision to permit 200906231101. install previously extg sky light above stair #3 to code. | $1,000 |
| Mar 15, 2011 | Never finaled issued Oct 2011, no final | 43 Barcelona Av | revision to pa# 2009.06.23.1101. install previously existing stair#3 to code ( remove unbuilt roof cover over stair# 3)Details
revision to pa# 2009.06.23.1101. install previously existing stair#3 to code ( remove unbuilt roof cover over stair# 3) | $2,000 |
| Dec 16, 2009 | Never finaled issued Mar 2010, no final | 41 Barcelona Av | revision to 200906231101. install new interior stairs to code. new windows at rear of bldg, furnace and water heater and reconfigure walls on 1st,2nd,3rd.Details
revision to 200906231101. install new interior stairs to code. new windows at rear of bldg, furnace and water heater and reconfigure walls on 1st,2nd,3rd. | $30,000 |
| Jun 23, 2009 | Completed final sign-off Oct 2014 | 41 Barcelona Av | to comply w/ nov 199703624, 200886120 fire damage repair. remove range at 1st fl. replace light well wall and stair. repair 10' by 10' 2nd fl framing, 20' by 15' 3rd fl and 10' by 10' roof framing. replace bathrm fixtures, kitchen fixtures, int.gyp bd, 6 rear wdws, 4 front wdws,install plywd n boltsDetails
to comply w/ nov 199703624, 200886120 fire damage repair. remove range at 1st fl. replace light well wall and stair. repair 10' by 10' 2nd fl framing, 20' by 15' 3rd fl and 10' by 10' roof framing. replace bathrm fixtures, kitchen fixtures, int.gyp bd, 6 rear wdws, 4 front wdws,install plywd n bolts | $400,000 |