Back to kitchen remodel contractors
Hughes Construction,Inc.
- Based in
- Redwood
- On San Francisco permits
- Jan 2006 to Aug 2011
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 72 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2006 | Completed final sign-off Apr 2007 | 315 Avila St | remodel kitchen & bath. remove & replace (e) 2 sinks, 1 tub, 1 shower, 1 gas line, wood floor & cabinets.Details
remodel kitchen & bath. remove & replace (e) 2 sinks, 1 tub, 1 shower, 1 gas line, wood floor & cabinets. | $75,000 |
| Jan 20, 2006 | Completed final sign-off Nov 2006 | 123 Corbett Av | replace exg 2 story deck, renovate exg kitchen, replace exg garage door, increase dwelling units from one to two units, all work to conform to variance 2005.0615v, no other workDetails
replace exg 2 story deck, renovate exg kitchen, replace exg garage door, increase dwelling units from one to two units, all work to conform to variance 2005.0615v, no other work | $40,000 |