Hughes & Company Construction, Inc
- Based in
- Mill Valley
- On San Francisco permits
- Nov 2013 to May 2026
- Last 24 months
- 1 permit filed
42 permits since 2000: 35 completed, 1 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 8 days from filing to permit and 594 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 3, 2019 | Completed final sign-off Mar 2021 | 77 Belgrave Av | ref pa# 201508184575; interior stair in a single family home arch. drawings of the stair have already been aproved, this provides structural drawings & calculationsDetails
ref pa# 201508184575; interior stair in a single family home arch. drawings of the stair have already been aproved, this provides structural drawings & calculations | $40,000 |
| Apr 7, 2016 | Completed final sign-off Dec 2017 | 165 Buena Vista East Av | add exterior stair from rear yard to 1st level above grade. add balcony/landing at top of stair. work not visible from street.Details
add exterior stair from rear yard to 1st level above grade. add balcony/landing at top of stair. work not visible from street. | $25,000 |
| Jan 25, 2016 | Completed final sign-off Sep 2018 | 89 Belgrave Av | replace existing driveway with new concrete driveway. provide new retaining wall at rear yard. provide new site walls and stair on grade at engry.Details
replace existing driveway with new concrete driveway. provide new retaining wall at rear yard. provide new site walls and stair on grade at engry. | $40,000 |
| Oct 22, 2014 | Completed final sign-off Oct 2015 | 3867 Washington St | provide temporary shoring along west property line for the excavation and construction of (n) stair per approved application 201404233989.Details
provide temporary shoring along west property line for the excavation and construction of (n) stair per approved application 201404233989. | $10,000 |
| Nov 8, 2013 | Completed final sign-off Oct 2015 | 3867 Washington St | interior renovation.reduce with&reloc garage dr to(e)frt wall at g/f.reduce(e)frt wndwgrill w/(n)gate.demo ext&int stair&replcw/(n)stair.move frt entry dr to g/f.(n)bedrm,bathrm,pwdr rm&laundry at g/f.reloc(e)metal flue.(n) balcony at 3/f rear.add bathrm to 3/f.(n)framing at roof.remov(e)skylite....Details
interior renovation.reduce with&reloc garage dr to(e)frt wall at g/f.reduce(e)frt wndwgrill w/(n)gate.demo ext&int stair&replcw/(n)stair.move frt entry dr to g/f.(n)bedrm,bathrm,pwdr rm&laundry at g/f.reloc(e)metal flue.(n) balcony at 3/f rear.add bathrm to 3/f.(n)framing at roof.remov(e)skylite.... | $200,000 |